Tenders

Tenders
Tenders
Start Date
Start Date
tender supply and installation of MS tapered square fabricated from Laser cut profiles of Inaugural Plaza structure at Miyapur Metro Station, Corridor-I 21-10-2017
tender Notice inviting short tender (through box tender system) for Urban Street Rejuvenation works 20-10-2017
tender Sealed tenders are invited for Construction of Public Toilets 20-10-2017
tender I) Urban Street rejuvenation works of Rasulpura, Prakash Nagar and Begumpet Metro Stations by Providing railing in Stage-3

II) Improvements and repair works to carriageway from Begumpet Police Station to Hyundai Showroom in stage 3 of Corridor-III

18-10-2017
tender Development of Landscaping at ESI, Erragadda, Moosapet and Balangar Metro Rail Stations

Development of Landscaping at Miyapur Metro Rail Station RHS and Zone C near Mahindra Show Room of LHS

Procurement of flowering and ornamental plants including shrubs, Ground Covers for development of greenery at ESI, Erragadda, Moosapet and Balanagar Metro Stations RHS and Zone C near Mahindra Showroom of LHS

Procurement of flowering and ornamental plants including shrubs, Ground Covers for development of greenery at Miyapur Metro Stations

16-10-2017
tender Dismantling of affected portion of property bearing H.No. 8-3-231/A/1(G+4), belonging to Sri S.B. Hasssan s/o Hassan Bin Salah (late) located at Krishan Nagar, required for metro rail alignment in stretch from Greenlands to Jubilee Hills of Metro Corridor-III

Dismantling of affected portion of property bearing H.No.8-2-231/73/A/B(Cellar+4), Belonging to Smt.Shobha Rani W/o.Hanumantha Rao, located at Krishan Nagar, required for metro rail alignment in stretch from Greenlands to Jubilee Hills of Metro Corridor-III

Dismantling of compound wall sump and restoration of staircase & sewer line situated at Dhanunjaya Chamber (H.No.8-3-219/19) and Divya Shakti Bhavan (H.No. 8-3-219/A&B) in stage-4 Corridor-III

Construction of compound wall at MNYP-39L Tirumala Residency, Madhura Nagar in stage-4 Corridor-III
13-10-2017
tender Dismantling of affected portion of property bearing H.No. 8-3-231/w/70 to 73 belonging to M/s. EVK Constructions PVT Ltd. and other located at Krishan Nagar, required for metro rail alignment in stretch from Greenlands to Jubilee Hills of Metro Corridor-III 13-10-2017
tender Bids are invited for Urban Street Rejuvenation Works in Corridor-III 10-10-2017
tender Sealed Tenders are invited for Urban Street Design in Corridor-I 10-10-2017
tender 1) Providing MS railing at Stadium, NGRI, Habsiguda Metro Stations

2) Providing MS railing at Secunderabad East, Parade Grounds, Paradise Metro Stations
09-10-2017
tender supply of procurement of Stationary & General Items required for Hyderabad Metro Rail Project 05-10-2017
tender Construction of convenience on Design, Build, Operate & Transfer (DBOT) basis for 12 Metro Rail Stations in Corridor - I and Corridor - III 04-10-2017
tender Bids are invited for Urban Street Rejuvenation Works in Corridor-III 03-10-2017
Enquiry for procurement of Ready Mix Bitumen / IRODR Bags 26-09-2017
Supply and Fixing of office furniture to HMR Officers, Begumpet. 25-09-2017
Supply and delivery of display boards 70 Nos to be put up at Secunderabad east, Parade grounds and Paradise stations in Corridor-III

Supply and delivery of display boards 90 Nos to be put up at Stadium, NGRI, Habsiguda, Tarnaka and Mettuguda stations in Corridor-III
22-09-2017
1) Construction of balance compound wall of home for aged at Bhoiguda Y Junction opposite Patel timber depot in corridor-II

2) Construction of balance compound wall adjacent to SPG church from Pier no. PRGSR35 to PRGSCR38 affected under 120 ft road widening from YMCA fly over to Secunderabad station in corridor-II
16-09-2017
Supply and fixing of Toughened glass for windows in MD Chamber, HMR Corporate office 15-09-2017
Supply and installation of 6 Nos Hawkers pavillion design, single structure with MS frame and GI Roof consisting of 5 Nos panels of size 2.95m x 2.95m each unit at Miyapur station in Corridor-I 12-09-2017
Balance work in Sainiik Aramghar building in old Gandhi hospital premises - Construction of water tanks, head rooms & sheet roofing on fifth floor, Secunderabad in stage - 3 of Corridor - III 08-09-2017
Urban street rejuvenation works - Providing paver blocks, tiles, kerb stones, railing, kiosk etc under urban street design works in Corridor-III (Recall) 08-09-2017
Providing frame work with weld mesh for piers to develop vertical greenery from Miyapur to LB Nagar and Nagole to Hitech City along the Metro Rail Corridor - I & III 08-09-2017
Urban street rejuvenation works - Providing paver blocks, tiles, kerb stones, railing, kiosk etc under urban street design works in Corridor-III 01-09-2017
Enquiry for procurement of Ready Mix Bitumen / IRODR Bags 31-08-2017
Notification Inviting offers from Artists / Art Firms for visual art work on Metro Rails pillar surface 30-08-2017
Construction of compound wall and yard development tao Sainik Aramaghar building in old Gandhi hospital premises in stage-3 of Metro Corridor-III. 24-08-2017
Providing 150mm thick CC Vacuum Dried Flooring (VDF) road in the widened portion from Rang Mahal Junction to opp: OMC South Gate (SUBMGBPP10R to 19R) RHS at Koti to facilitate metro works in Corridor-II 21-08-2017
Supply and Fixing of Retro Reflexive Sign Boards at in front of HMR Corporate office and in office 19-08-2017
Regradation of road with BT from MAd 35 (Hitech Bawarch restaurant) to MAD36 (Sarvi restaurant) and Mad 29 (Prakash light house) to MAD 30 (Syndicate Bank), Madhapur Hitech city Main road in stage-4 Corridor-III, HMR(2nd Call) 19-08-2017
Urban street rejuvenation works - Providing paver blocks, tiles, kerb stones, railing, kiosk etc under urban street design works 18-08-2017
Providing Railing with provision to advertise in front of retails stalls at Bharath Nagar in Corridor-I

03-08-2017
  I) Central Media : Nagole to Tarnaka :- Maintenance of existing central media of 3.8 KMs and development of central media along with landscaping for a distance of 1(One) kilometer on BOT basis with a license period of 10 years and license rights for erecting advertisement boards of 3'X4' for every 30 meters.

II) Side View of Gymkhana & Parade Grounds :- maintenance of landscaping and side walk including seating arrangement on BOT basis with a license period of 10 years and license right for erecting advertisement boards of 3'X4' for every 30 meters

1-08-2017
I) Regradation of road with BT from Green land junction (BAP: 11) to Lal bungalow (BAP- 23) on Ameerpet road in stage-4, corridor-III.

II) Regradation of road both sides with BT from Lal bungalow ( BAP- 23) to Kanaka Durga junction on Ameerpet road in stage-4, Corridor-III

III) Regradation of road both sides with BT from kanaka Durga junction ( BAP- 38) to Rehamath Comercial Complex (BAP - 45) on Ameerpet road in stage-4, Corridor-III

IV) Regradation of road both sides with BT from MAD 35 (Hitech Bawarch restaurant) to MAD 36 (Sarvi restaurant) and MAD 29( Prakash light house) to MAD 30 (Syndicate Bank), Madhapur, Hitech city main road in stage-4, Corridor-III

29-07-2017
  HMR-Providing Dais, beading to two walls with wallpaper in the conference hall on 4th floor of HMR Corporate office, Begumpet quotations called.

28-07-2017
  Bids are Invited for Raising and Maintenance of Avenue Tree plants
28-07-2017
  Supply of Ready Mix Bitumen / IRODR Bags
28-07-2017
  Dismantling of affected portion of premises No 1-90/2/1/C (Delhi wala sweet) at Madhapur village, Serlingampally mandal in stage-4, Corridor-III
28-07-2017
  Supply of Bitumen emulsion barrels

28-07-2017
  Construction of Retaining wall in effected portion of the building (Thanmai electronic) falling in Arm-3 of Khairatabad Metro Station Corridor-I
26-07-2017
  I) Regradation of road with BT from State Bank of India (MNYP - 03) to Ratnadeep Super Market (MNYP - 19) in Madhura Nagar road in stage-4, Corridor-III, HMR

II) Laying of BT on Road widening from Chalis Makaan (AMNP-6) to Al-Saba restaurant (AMNP- 18) in RHS, Madhura Nagar road in stage-4, Corridor-III, HMR

III) Regradation of road with BT from Savera function hall (MNYP-29) to Indian petrol pump (YRP-14) to Almas restaurant (YR5P- 19) Madhura Nagar to Yousufguda stretch, Krishna Nagar main road in stage-4, Corridor-III, HMR

24-07-2017
  HMR- Stationery (Printed Items) - Requirements for six months
21-07-2017
  I) Laying storm water pipe drain from Mahalakshmi Jewellers to Satyanarayana Jewellers, Jubilee Hills road NO 36 in stage-4, Corridor-III, HMR

II) Raising and repairs to the catch pits from Yousufguda station to YRSP-10(Balaji Mithai Bhandar) in Metro Rail corridor-III, Stage-IV, HMR.

III) Construction of table drain from Hackers Kitchen(JCPSTN-11) to Kalanjali show room(JCPTP-02) at road No 36 and road No 1 & 5 junction, stage-4, Corridor-III.

IV) Construction of compound wall at open land at Government High School, Yousufguda, Hyderabad in Corridor-III.

21-07-2017
  I) Urban Street Design at RHS and LHS of Metuguda Metro Station by providing Paver blocks, Tiles and Kerb stones, Railing etc., in Corridor-III.

II) Urban Street Design LHS of Tarnaka Metro Station by providing Paver blocks, Tiles and Kerb stones, Railing etc., in Corridor-III.

III) HMR Urban Street Design at RHS of Tarnaka Metro Station by providing Paver blocks, Tiles and Kerb stones, Railing etc., in Corridor-III.

20-07-2017
  Dismantling of 3 properties bearing door no 5-8-230, 5-8-230/4 from Ravindra Bharati Junction to M.J. Market Junction in Metro Rail Corridor-I.
14-07-2017
  Dismantling of 6 properties bearing door no 12-6-21/A, 12-6-21, 11-5-266/2, 11-5-264, 11-5-264 and 11-5-230 from Balanagar to Bharath Nagar flyover in Corridor-I (2nd call)
11-07-2017
  Repairs and Maintenance Road from Khairatabad to LB Nagar in Corridor-I During Monsoon 2017 (2nd Call)
11-07-2017
  I) Construction of SW drain at Vivo Show room (RHS) From DGC 05 to 07, Durgam cheruvu in Corridor-III (2nd call)

II) Laying Storm water drain by providing 450MM dia RCC NP3 class pipes from IOCL to Honda show room on road No 36, Jubile Hills in stage-4, Corridor-III (2nd call)

III) Dismantling of affected portion of flat No 202 in Siri Sampada Apartment (H.N 1-65/4/4) situated at Guttala Begumpetm Madhapur in Metro Rail alignment in Corridor - III

IV) Providing cement bonded pre-laminated partition in stilt floor of canteen area for EDMS section in HMR Corporate Office at Begumpet

V) Repairs to open drain in Lenin Club to Hitech Bawarchi at RHS and Trishul Grand and Vikram Hospital side lane at LHS in Corridor-III (2nd call)

11-07-2017
  repairing of conference table on 4th floor in HMR Corporate office, quotations called
10-07-2017
  Providing Storage Rack in Directors Room for MD Peshi on 4th floor of HMR Corporate office, Begumpet
06-07-2017
  I) Central Media : Nagole to Tarnaka :- Maintenance of existing central media of 3.8 KMs and development of central media along with landscaping for a distance of 1(One) kilometer on BOT basis with a license period of 10 years and license rights for erecting advertisement boards of 3'X4' for every 30 meters.

II) Side View of Gymkhana & Parade Grounds :- maintenance of landscaping and side walk including seating arrangement on BOT basis with a license period of 10 years and license right for erecting advertisement boards of 3'X4' for every 30 meters

Tender Schedule
I) Central Media : Nagole to Tarnaka
Plan for Central Media
II) Side View of Gymkhana & Parade Grounds


06-07-2017
  repairs and maintenance of road by engaging Men & Machinery and Material from Secunderabad East station to Greenlands for the year 2017-18 in Corridor-III during monsoon
05-07-2017
  I) Improvements and repair works to carriageway from Secunderabad east station to Paradise Metro station in Stage-3 of Corridor-III

II) Improvements and repair works to carriageway from Paradise Metro station to Greenlands in Stage-3 of Corridor-III
05-07-2017
  Laying of service road with cement paver blocks at LHS of JNTU Metro Station in Metro Rail Corridor-I
04-07-2017
  Urban street Design in Zone C at LHS of Miyapur Metro Station by providing Paver Blocks,Tiles and Kerb stones etc in Corridor-I
04-07-2017
  Urban street Design in Zone A at LHS of Miyapur Metro Station by providing Paver Blocks,Tiles and Kerb stones etc in Corridor-I
04-07-2017
  Urban street Design in Zone A at RHS of Miyapur Metro Station by providing Paver Blocks,Tiles and Kerb stones etc in Corridor-I
04-07-2017
  Laying of service road with cement paver blocks at RHS of JNTU Metro Station Metro Rail Corridor-I
04-07-2017
  Providing cupboards in Minister anti room & pantries on 4th floor of HMR Corporate office, Begumpet
30-06-2017
  Repairs and Maintenance Road From Miyapur to Khairatabad in Corridor-I During Monsoon 2017 (2nd call)
30-06-2017
  Dismantling of seven Properties Bearing Door No's :- 3-5-17, 3-5-15, 3-4-24, 3-3-90, 3-3-89/1, 3-2-50 in Kukatpaly area in Metro Corridor-I.
28-06-2017
  Laying of BT Road From Miyapur to Khairtabad (In appropriate stretches) for the year 2017-18
28-06-2017
  Improvement and repair works to Carriageway from Nagole to Habsiguda in Stage-I of Corridor-III for the year 2017-18
28-06-2017
  GHMC - Central Zone- Division No. 10C Maintenance of existing SW Drain - Raising of existing SW Drain catch pits on Krishna Nagar main road
23-06-2017
  improvement and repair works to Carriageway from Habsiguda to Secunderabad east station of corridor - III for the year 2017-18
22-06-2017
  Special repairs and maintenance BT Road From Khairtabad to LB Nagar (In appropriate stretches) for the year 2017-18
21-06-2017
  Repairs and maintenance of road by engaging men & machinery and material from Secunderabad East station to Greenlands for the year 2017-18 in corridor-III during monsoon
20-06-2017
  I) Repairs and maintenance of road from JBS to Musheerabad X roads in corridor-II during monsoon 2017
II) Repairs and maintenance of road and storm water drains to avoid water stagnation for the year 2017-18 in corridor-II
20-06-2017
  Repairs and Maintenance Road From Khairatabad to L B Nagar in Corridor-I - During Monsoon 2017
19-06-2017
  Providing Table drain from Punjagutta Metro Station to Flyover bridge at Punjagutta in Corridor-I
19-06-2017
  dismantling of 6 properties bearing door no 12-6-21/A, 12-6-21, 11-5-266/21 11-5-264, 11-5-264 and 11-5-230 from Balanagar to Bharath Nagar flyover in Corridor-I
19-06-2017
Repairs and Maintenance Road From Miyapur to Khairtabad in Corridor-I during Monsoon-2017.
15-06-2017
Laying of BT Road From Miyapur to Khairtabad (In appropriate stretches) for the year 2017-18
15-06-2017
I) Repairs and maintenance of road by engaging men & machinery and material from Secunderabad East station to Greenlands for the year 2017-18 in corridor-III during monsoon
II) Providing 600 mm dia RCC NP-3 class pipes from pier No. MSP-30 to MSP-31A on LHS near Allugaddabaci in stage-III of Corridor-III
13-06-2017
Providing sofa set in Ministers anti room on IV floor of HMR Corporate office
07-06-2017
Supply of Ready Mix Bitumen / IRODR Bags
07-06-2017
Repairs and maintenance of road by engaging men & machinery and material from Nagole Station to Secunderabad East station for the year 2017-18 in corridor-III during monsoon
07-06-2017
Laying storm water drain by providing 600 mm dia RCC NP3 pipes on Road no. 5, Jubilee Hills from R5JCP05 to R5JCP07 on front of Zoom Cars in Metro Rail corridor-III (2nd Call)
06-06-2017
Providing Storage Rack for Janitor room beside toilets on 1st, 2nd & 3rd floor and store rack in recreation hall on 2nd floor of HMR Corporate office, Begumpet
05-06-2017
Supply And Fixing of Store Racks & Almaraihs to HMR Officers
03-06-2017
I) Providing sewer and water line connection for the Plot No 8-2-293/82/1/227/A, S Murali, Jubilee Check Post in stage-IV, Metro Rail Corridor-III (2nd Call)
II) Extension of SW drain from BAP:21 to Divya Shakti Apartment (existing drain) in RHS, Green lands road, stage-IV, Corridor-III (2nd Call)
03-06-2017
Construction of Catch pits and special repairs to Strom water drains and catch pits on NH- from Lakdikapul to Kothapet of Metro Rail Corridor-I
03-06-2017
Providing storage runners to HMR officials in HMR Corporate office, Begumpet
31-05-2017
I) Repairs and maintenance of road from JBS to Musheerabad X roads in corridor-II during monsoon 2017
II) repairs and maintenance of road and storm water drains to avoid water stagnation for the year 2017-18 in corridor-II
31-05-2017
I) Laying of Storm water drain by providing 600m dia RCC NP3 pipes on road No 5, Jubilee Hills from R5JCP05 to R5JCP07 in front of Zoom cars in Metro Rail Corridor-III
II) Providing sewer and water line connection for the Plot No 8-2-293/82/1/227/A, S Murali, Jubilee Check Post in stage-IV, Metro Rail Corridor-III
III) Extension of SW drain from BAP:21 to Divya Shakti Apartment (existing drain) in RHS, Green lands road, stage-IV, Corridor-III
IV) Extension of SW drain from BAP:13 (opp mekin Maheswari chambers) to Green park hotel in RHS and in front of Maheswari chambers to existing drain, Green lands road, stage-IV, Corridor-III
27-05-2017
Providing and Fixing of Vertical & Roller blinds in MD Chamber on 4th floor of HMR Corporate office Begumpet.
27-05-2017
Providing Storage Rack to Account Section on 3rd floor of HMR Corporate office, Begumpet
26-05-2017
Repairs to open drain at Balanagar Y junction and repairs to catch pits at Kukatpally and KPHB Metro Station, Metro Rail Corridor-I
26-05-2017
Providing table drain from Model House , Panjagutta to KCP Junction RHS in Corridor-I
26-05-2017
Removal of Debris and Clearing High berm in the Precinct of Moosapet Metro Station, Corridor-I
26-05-2017
Construction of Catch pits and special repairs to storm water drains and catch pits on NH-65 from Lakdikapul to Kothapet of Metro Rail Corridor-I
26-05-2017
Laying of 600mm dia NP-3 SW drain from Nampally bus stop to Shalimar furniture shop on RHS of Nampally Metro Rail Corridor-I
26-05-2017
Clearing High berm in front of Sion Fellowship Church, Hyderanagar in Corridor-I
25-05-2017
I) Repairs and maintenance of existing Storm Water Drain between Sagarlal Memorial X road to Rolex Cafe in corridor-II
II) Repairs and maintenance of existing Storm Water Drain between BSNL office to RTC X roads in corridor-II
III) Construction of CD work by providing 900mm dia RCC NP3 class pipe at Bhoiguda Y Junction in Corridor-II
23-05-2017
Clearing High berm in fron of Sion Fellowship Church, Hderabad in Corridor-I
19-05-2017
Construction of catch pits, laying of paver blocks and special repairs to man holes of Strom water drains in NH-65 from VOM Station to LB Nagar Metro Station in Stage-5 of Metro Rail Corridor-I
19-05-2017
High Berms cutting and desilting of drains / catch pits in fornt of old age home/ Patel timber depot ware house corporation in Corridor-II
18-05-2017
I) Repairs and maintenance of existing Storm Water Drain between Sagarlal Memorial X roads to Rolex cafe in corridor-II
II) Repairs and maintenance of existing Storm Water Drain between BSNL office to RTC X roads in corridor-II
III) Construction of CD work by providing 900mm dia RCC NP3 Class pipe at Bhoiguda Y Junction in Corridor-II
17-05-2017
HMR Corporate Office-MD, HMRL Chamber-Procurement of furniture, quotations called
10-05-2017
Analysis, supply and design of tensile membrane and supporting structure, supply of ferrari or equivalent fabric, fabrication of membrane and connection systems, support MS structure, installation of structural membrane and connection system & tensioning and painting the structure with once coat of primer and two coats of enamel brush paint rate including cost and conveyance of material, labour, complete for finished item of work of size 45ft x 18ft (810 sft)
09-05-2017
Providing 450MM dia RCC NP3 class pipes near stadium station (LHS & RHS) in stage-1 of corridor-III
10-05-2017
Dismantling of Old TSPDCL (Fuse Office) affected under road widening at Musheerabad Junction and laying of CC road in the Widened portion in Corridor-II
10-05-2017
Addendum 3 To The RFQ For Multi Level Parking
08-05-2017
Providing toilets in existing projector room and pantry room on 4th floor in HMR Corporate Office, Begumpet(2nd call)
02-05-2017
Urban Street Design at LHS and RHS of ESI Metro Station by Providing Paver Blocks, Tiles and Kerb Stones etc in Corridor-I
03-05-2017
Providing interlocking of pavers in the damaged portion of the service road on RHS of Uppal Metro station and at Uppal Junction on LHS in Corridor - III
01-05-2017
HMR-Corridor-II- Laying of Pre-cast RCC drain covers over masonry drain at old age home (Bhoiguda) & Cantonment Park (JBS) in Corridor-II
29-04-2017
Addendum 2 to the RFQ for Multi Level Parking
29-04-2017
Procurement of flowering, Ornamental plants, including ground covers for development of greenery at SR Nagar, JNTU, KPHB and Kukatpally Metro Rail Stations during 2017-18(2nd call)
29-04-2017
Providing 150MM thick C.C road in the widened portion near from Sri Balaji Mithai shop to Blue sea Hotel near LHS of Secunderabad East Metro station and Restoration of road relocation of 300MM dia DI water supply at Paradise Metro station entry/exits foundation in stage -3 to facilitate metro works in Corridor- III
26-04-2017
I) Providing 450mm dia RCC NP3 class pipes near stadium station (LHS & RHS) in stage - 1 of corridor-III.
II)Providing 450mm dia RCC NP3 class pipes No. NUP-22 to 23 and NUP-28 to 29 (LHS) b/w stretch from Nagole to Uppal station in stage - 1 of corridor-III.
25-04-2017
Proposed drain pipe with catchment pits & gratings on LHS adjacent to escalator Arm of Balanagar Metro station, in Metro Corridor-I
19-04-2017
HMRL Recruitment of Law Assistant
17-04-2017
NIQ for Stationery
15-04-2017
I) Providing 450mm dia RCC NP3 class pipes near stadium station(LHS & RHS) in stage-1 of corridor-III
II)Providing 450mm dia RCC NP3 class pipes No. NUP-22 to 23 and NUP 28-29(LHS) b/w stretch from Nagole to Uppal station in stage-1 of corridor-III
II)Providing 450mm dia RCC NP3 class pipes near Prakash Nagar (pier No. RPNP-29 to 31) in stage-1 of corridor-III
II) Improvements to repair works to carriage way between pier no. NDP 20 to 23 at Nagole in stage-1 of corridor-III7

15-04-2017
Providing Storage Rack to Accounts Section, Dated 15.04.2017
15-04-2017
e Procurement Notice: NIT No. 63/EE-III/HMR/2017-18, Dated 13.04.2017
13-04-2017
Response to Queries (Addendum 1)
12-04-2017
I)Procurement of flowering, Ornamental plants including ground covers for development of greenery at SR Nagar, JNTU, KPHB and Kukatpally Metro Rail Stations during 2017-18

II)Development of Greenery at SR Nagar, JNTU, KPHB and Kukatpally Metro Rail Stations during 2017-18

11-04-2017
Proposed drain pipe with catchment pits & grating on LHS adjacent to escalator Arm of Balanagar Metro Station, in Metro Rail Corridor - I.
07-04-2017
I) Construction of Sump, Watchman room at Padmahamsa Apartment situated in Corridor-III
II)Reconstruction of compound wall of HMDA District complex at Tarnaka Flyover in Corridor-III

07-04-2017
Providing Storage Rack for Janitor room beside toilets on 1st,2nd 3rd floors and store rack in recreation hall on 2nd floor of HMR Corporate office, Begumpet
04-04-2017
Providing Storage Rack to Accounts Section on 3rd floor of HMR Corporate office, Begumpet
04-04-2017
Providing Storage Runners to HMR officials in HMR Corporate office, Begumpet
04-04-2017
I) Dismantling of affected portion of AK Ready-made garments (M/s. Premier Publishing) situated near sultan bazaar in corridor-II
II) Dismantling of Sulabh complex adjacent to women's college, Koti to facilitate metro works in corridor-II
III) Dismantling of Sulabh complex adjacent to GHMC complex, Koti to facilitate metro works in corridor-II

30-03-2017
Development of Landscaping at Miyapur Metro Rail Station
30-03-2017
I) HMR - Corridor-II Dismantling of the affected portion of Neelakanth Ready-made Textiles situated at Koti, Hyderabad in Corridor-II
II) HMR - Corridor-II Dismantling of the affected portion of Vaibhav garments situated at Koti, Hyderabad in Corridor-II

27-03-2017
Supply of red soil and farmyard manure etc for filling into PVC pots for planting of ornamental plants etc placing at Miyapur to SR Nagar Metro Station
27-03-2017
Providing security services to the HMR buildings at Rasoolpura, Saifabad, Puthlibowli, Kukatpally and other locations for the year 2017-18
15-03-2017
HMR Corridor II- Providing fencing to the widened portion between Bawarchi Hotel and Raja Rajeswari temple on RHS(Pier nos. PRGSCRNP24 to PRGGSCRNP28 to avoid encroachments and dumping debris in Stage-6, Corridor-II.
14-03-2017
Request for Qualification for Multi Level Parking Complex for Hyderabad Metro Rail
RFQ Document for MULTI LEVEL PARKING COMPLEX - Nampally & Gandhi Bhavan
13-03-2017
Providing Submerssible 1.5Hp Pump Set and arrange water supply connection in WTTI, Taruni Complex, Madhuanagar (In Corridor-I) 07-03-2017
Laying of Footpath under Bharath Nagar Metro Station (Under Corridor - I) Hyderabad 07-03-2017
HMR - Enquiry for procurement of general stationary items - quotations called for Regarding 27-02-2017
Providing Submersible 1.5Hp Pump Set and arrange water supply connection in WTTI, Taruni Complex,Madhuranagar (in Corridor-I). 23-02-2017
HMR- Providing interiors to MDs Chamber on 4th floor HMR Corporate office, Begumpet 09-01-2017
HMR-Corridor-II-Dismantling of old building and construction of compound wall for left over portion of Telangana State Warehousing corporation, Hyderabad affected under road widening Opp: New Gandhi Hospital, Musheerabad in Corridor-II &
HMR-Corridor-II-Dismantling of premises no.6-4-39 Masjid-e-able with Graveyard belonging to Waqf Board affected under road widening at Musheerabad Junction in Corridor-II
05-01-2017
Tenders
Tenders
Start Date
Start Date
  Restoration of compound wall and watchman room in Plot No 702A belonging to Dr V Murali at PTMPP-25 at Jubilee Hills, Road No-36, Stage-IV, Corridor-III, HMR 20-12-2016
  Providing services of personnel on outsourcing basis for the period of one year i.e from 01.01.2017 to 31.12.2017 26-11-2016
  HMR - Providing Vertical blinds to windows in 1st, 2nd and 3rd floors for HMR Corporate Office at Begumpet. 26-11-2016
  HMR - Corridor - III - Dismantling of 2 (two) Private porperties bearing H.No: 9-1-86 & 9-9-86/1 situated at S.P. Road, Secundrabad on Corridor - III. 25-10-2016
  Construction of compound wall and sump at Thirumala Residency in Corridor - III, HMR
Restoration of road works from Secunderabad East Station to Sangeeth junction along Metro corridor - III, HMR
Development of footpath infront of HMR Corporate office Building to Begumpet in stage - 3, Corridor - III.
17-10-2016
  Restoration of road works from Jubilee hills check post station to Peddamma temple station along Metro corridor-III. 15-10-2016
  Emergency repairs and re-carpeting of BT roads in Corridor-I & III, HMR(09 Works)
Providing 1000mm and 600mm dia RCC NP4 class storm water drain pipe line(1 work)
Repairs, maintenance of existing BT road between JBS to Kacheguda X roads in Corridor-II (2 works).
6-10-2016
  Emergency repairs and re-carpeting of BT roads in Corridor-I & III, HMR (09 Works). 6-10-2016
  HMR - Supply of Procurement of Stationary & General Items required for Hyderabad Metro Rail Project. 3-10-2016
  HMR - Supply of Procurement of Stationary & General Items required for Hyderabad Metro Rail Project. 3-10-2016
  HMR - Corridor-II-Laying 450mm dia RCC NP3 class storm water drain pipe line infront of Srinivasa bakery Bolakpur x road on Musheerabad main road in corridor-II to avoid damage of road in Corridor-II.
HMR Corridor-II-Providing 150mm thick C.C road in the Widened portion infront of Patel timber depot and home for aged at Musheerabad to facilitate metro works in corridor-II
HMR-Corridor-II-Road cutting restoration by laying CC from pier no.CDPNARNP26 to NARSUBNP03 at Narayanguda on RHS where 600mm dia sewer line taken up by LTMRHL to facilitate construction of metro works in Stage-6/1, Corridor-II.
HMR-Corridor-II-Road cutting restoration by laying CC from pier no. CDPNARMP26 to NARNATST07 at Narayanguda on RHS where 800mm dia water line taken up by LTMRHL to facilitate construction of metro works in Stage-6/1, Corridor-II.
HMR-Corridor-II-Providing 150mm think C.C road in the Widened portion Opp: Police quaters, Narayanaguda on RHS between YMCA x road and Kachiguda x road to facilitate metro works in corridor-II
3-10-2016
  HMR, Corridor-III renovation, repairs to Landscaping developed in front of Rail Nilayam during 2012-13 by HMR. 23-09-2016
  Development of Greenery/Landscaping at HMR Corporate Office Building at Rasoolpura/Begumpet. 22-09-2016
  HMR - Supply of Procurement of Stationary & General Items required for Hyderabad Metro Rail Project 16-09-2016
  (Revised) Expression of Interest for Integrated Multi Level Parking (MLP) and Skywalks for Hyderabad Metro Rail Limited (As modified after Pre bid meeting) -
  Corrigendum - 1 -
  HMR - Procurement of Stationary & General Items required for Hyderabad metro Rail Project - Supply of A4 size Xerox Challenger Paper (75 GSM) - Reg 20-08-2016
  HMR-Repairs and maintenance of Corridor-II road carriage way by engaging men & machinery and material for the year 2016-17 19-08-2016
  Dismantling of affected property H.No 8-2-293/62/A/61/1, Plot 60 & 61A (Transtroy Corporate Office building) at Jubilee Hills, stage-IV, Corridor-III, HMR 16-08-2016
  (Revised) Expression of Interest for Multi Level Parking with commercial space (MLP) and Skywalks for Hyderabad Metro Rail - Advertisement 11-08-2016
  (Revised) Expression of Interest for Integrated Multi Level Parking with commercial space (MLP) and Skywalks for Hyderabad Metro Rail 11-08-2016
  Improvements to carriageway between Prakash Nagar Station and Begumpet flyover in corridor-III, HMR 05-08-2016
  HMR - Repairs and Maintenance of Corridor-II road carriage way by engaging men & machinery and material for the year 2016-17 02-08-2016
  Improvements to carriageway between Prakash Nagar Station and Begumpet flyover in corridor-III, HMR. 30-07-2016
  Repairs and recarpetting of BT road in the reach from Dilshuknagar to LB Nagar of Metro Rail Corridor-I. 25-07-2016
  Repairs and recarpetting of BT road in the reach from New Market Station to Dilshuknagar Station of Metro Rail Corridor-I. 25-07-2016
  Repairs to damaged B.T Carriage way from Kukatpally to Mythrivanam (in Corridor -I). 21-07-2016
  Repairs to damaged B.T Carriage way from Ameerpet X road to Irrum Manzil Stations (In Corridor-I). 21-07-2016
  HMR - Attending Bituminous Patch work from Jubilee Hills check post to Durgam Cheruvu station in stage - 4, Corridor III, HMR. 16-07-2016
  Repairs and recarpetting of BT road in the reach from Khairtabad to Nampally of Metro Rail Corridor - I 15-07-2016
  Repairs and recarpetting of BT road in the reach from City Model school to New market of Metro Rail Corridor - I 15-07-2016
  Repairs and recarpetting of BT road in the reach from MJ Market to OMC of Metro Rail Corridor - I 15-07-2016
  Repairs to damaged B.T Carriage way from SR.Nagar-Khairathabad stations(In Corridor-I) 15-07-2016
  Dismantling of property bearing nos from 8-2-231/A/17 (sketch no 154) to 8-2-231/A/3 (sketch no 165) at Srikrishna Nagar, Corridor III, HMR &
Raising of compound wall and providing chain link fencing inside of Nursery at Hydernagar, Corridor-I, HMR.
04-07-2016
  Dismantling of Private properties belongs to Sri. panduranga Swamy Vittaleswara Venkatadri Temple and GuttikondaLodge at Secunderabad affected in Construction Secunderabad Metro Station in Corridor-III, HMR. 02-07-2016
  Providing steel structure for food court and Amphi theatre on terrace of commercial complex at Puthlibowli, Hyderbad (Re-tender). 28-06-2016
  Laying of CC Road and Construction of compound wall at Arm-I of Malakpet Metro Station near Masjid-E-Quadri, Chaderghat. 28-06-2016
  HMR-Avenue Tree Plantation from JNTU to Hitech City Road under Haritha Haaram during the year 2016-17. 15-06-2016
  HMR-Supply and delivery of furniture to New Government Junior college at YMCA, Secunderbad affected under road widening in corridor-II-Reg. 14-06-2016
  Construction of compound wall with MS grills to HMR Corporate Office at Rasoolpura Police lines, begumpet, Hyderabad in stage-3, Corridor-III 14-06-2016
  Providing steel structure for food court and Amphi theatre on terrace of commercial complex at Puthlibowli, Hyderbad. 09-06-2016
  HMR - Avenue Tree Plantation from JNTU to HItech City Road under Haritha Haaram during the year 2016-17 08-06-2016
  HMR-Corridor-II-Dismantling of Mahalaxmi and Ganga Jamuna premises no.4-4-142/1 to 9, situated near Bata Junction, Hyderbad on Metro Corridor-II
HMR-Corridor-II-Dismantling of Mahalaxmi Handloom centre premises no.4-5-281 to 4-5-286, situated at Bata Junction, Koti, Corridor-II.
HMR-Corridor-II-Dismantling of Neemkar & Sons premises no 4-5-305, situated at Bata Junction, Koti, Corridor-II
HMR-Corridor-II-Providing of Kerbing and removal of debris at approach road to Shahinayathgunj Police Barracks to facilitate metro works in Corridor-II.
HMR-Corridor-II-Providing chain link in Shahinayathgunj Police Barracks to facilitate metro works in corridor-II.
HMR-Reconstruction of Masonry Strom water drain infront of Home for Aged, Musheerabad to facilitate metro wroks in corridor-II.
HMR-Reconstruction of Masonry Strom water drain infront of splay portion at Upkaar Junction, Picket Park in Secunderabad to facilitate metro works in corridor-II.
07-06-2016
  HMR - Providing Avenue Tree Plantation in the colonies around Midhani Bus Depot during the year 2016 - 17 - Reg.
HMR - Providing Avenue Tree Plantation Sarojini Academy near RTC X ROADS premises during the year 2016-17
HMR - Providing Avenue Tree Plantation Hakeempet near Rajiv rahadari colony premises during the year 2016-17-Reg
HMR - Providing Avenue Tree Plantation around Falaknuma Jr.College and Govt School premises, during the year 2016-17-Reg
HMR - Providing Avenue Tree Plantation in and around Farooq nagar (Falaknuma Bus Depot) during the year 2016-17-Reg
06-06-2016
  Providing & Laying of back rest lawn seat benches in the proposed development of louise braille park at malakpet quarters, Hyderbad in Metro Rail Corridor- I 27-05-2016
  HMR - Raising of Avenue plantation from Hydernagar to RC puram on L/s and R/s NH 65 (including Gap filling from Ameerpet to Hydernagar) during 2016 - 17 under Telangana Ku Haritha Haram &
HMR - Raising of Avenue Tree plantaion in the wavers colony, Bhavana Nagar, Saket road, Kapra, Ecil during 2016 - 17 under Telangana Ku Haritha Haram.
27-05-2016
  Repairs, maintenance and formation of BT road from Chikkadpally Gulshan hotel to Musheerabad X road to facilitate Metro works in corridor-II, HMR &
Road cutting restoration by providing BT by Hot Mix Process from YMCA Narayanaguda (Madapati Hanumantha Rao) to Police quarters gate where 600mm & 450mm dia water supply line laid by LTMRHL under utility shifting on LHS in stage 6/1, Corridor-II, HMR &
Road cutting restoration by providing BT by Hot Mix Process from Time Institute (YMCA Narayanaguda) to Raj Mohal lane (dargah) where 600mm dia sewer line laid by LTMRHL wnder utiltiy shifting on RHS in stage 6/1, Corridor-II,HMR.
25-05-2016
  HMR - Development of Greenery/Landscaping (1000 Rmt) below viaducts from Habsiguda Station to Tarnaka Flyover in corridor-III 24-05-2016
  HMR - Dismantling of one property bearing H.No.8-2-254 (Adjacent Tiny Toys School) situated behind Mallanna Temple on Secunderabad Clock Tower road in Corridor - II &
HMR - Repairs, maintenance and formation of BT road from Bata Junction to Andhra Bank via Sultan Bazaar to facilitate the construction of metro pier NARSUBNP29 to 37 to facilitate metro works in corridor-II &
HMR - Providing 150mm thick C.C road in the Widened portion from Bata Show Room to Raj Mohall Road on RHS between YMCA x road and Kachiguda x road to facilitate metro woks in corridor - II.
23-05-2016
  Expression of Interest for Multi Level Parking with commercial space (MLP) and Skywalks for Hyderabad Metro Rail - Advertisement 23-05-2016
  Expression of Interest for Integrated Multi Level Parking with commercial space (MLP) and Skywalks for Hyderabad Metro Rail 23-05-2016
HMR - Raising of Avenue plantation to RC puram on L/s and R/s NH 65 (including Gap filling from Ameerpet to Hydernagar) during the year 2016-17 under Telangana ku Haritha Haaram & HMR - Raising of Avenue tree plantation in the wavers colony, Bhavana Nagar, Saket road, Kapra, Ecil during the year 2016-17 under Telangana ku Haritha Haaram. 21-05-2016
Dismantling of DM office, Generator room & sheds of kukatpally RTC bus depot- Hyderabad. 20-05-2016
Construction of additional accommodation building to Begumpet Post Office, in stage-3, Corridor-III, HMR. 20-05-2016
HMR - Raising of Avenue tree plantation along the corridor-II between JBS to Narayanguda, during the year 2016-17-Reg & HMR - Raising of Avenue tree Plantation at Subhash Chandra nagar colony & Sri ram nagar colony near ECIL-Reg. 18-05-2016
Plantation of trees from Uppal to Secunderabad and surrounding of corridor-III (Chiluka Nagar, Uppal ZPHS, Kendriya Vidyalaya, Karkhana Kendriya Vidyalaya) and Cantonment for the year 2016 & Raising of avenue plantation at NGO's colonies, Gachibowli and surroundings for the year 2016, Corridor-III & HMR - Avenue Tree plantation in Osmania University premises during the year 2016-17 under Telangana ku Haritha Haaram. 17-05-2016
Raising of single petal neeriums in the central median of NH-65 from Hayath Nagar Bus stop Km 20/0 to ORR 25/0 under Haritha Haaram during 2016-17 & Avenue plantation in central median of NH-65 from LB Nagar at KM 16/0 to 25/0 under Harith Haaram during 2016-17. 17-05-2016
HMR - Avenue plantation in the colonies around Karmanghat during the year 2016-17 under Haritha Haaram scheme & HMR - Avenue plantation in the colonies of Saroor Nagar mandal during the year 2016-17 under Haritha Haaram scheme & HMR - Avenue plantation in the colonies around BN Reddy Nagar during the year 2016-17 under Haritha Haaram scheme & HMR - Avenue plantation in the colonies around Boduppal during the year 2016-17 under Haritha Haaram scheme & HMR - Avenue plantation in the colonies around Hasthinapuram during the year 2016-17 under Haritha Haaram scheme. 16-05-2016
HMR-Raising Avenue Tree plantation from Hydernagar to RC puram on L/s and R/s NH 65 (including Gap filling from Ameerpet to Hydernagar) during 2016 - 17 under Telangana Ku Haritha Haram & HMR-Raising Avenue Tree plantation in the wavers colony, Bhavana Nagar, Saket road, Kapra, Ecil during 2016 - 17 under Telangana Ku Haritha Haram. 16-05-2016
HMR-Raising Avenue Tree plantation along BDL Compound wall from Kanchan Bagh to Balapur X roads during the year 2016-17 under Telangana Ku Haritha Haram Programme. 16-05-2016
Construction of Under ground Sumps for Hostel and RJD blocks in WD&CW Premises at Madhuranagar, Hyderbad. 13-05-2016
Construction of Under Ground Sumps for WTTI and Commissioner Blocks in WD&CW Premises at Madhuranagar, Hyderbad. 13-05-2016
HMR- Providing avenue plantation at Neredmet main road and MJ colony at Moulali-Reg & HMR- Raising of avenue plantation along Moulali main road, during the year 2016-17 & HMR- Raising avenue plantation at Jawahar nagar colony and Diamond hills colony at Moulali, during the year 2016-17-Reg & HMR- Raising of avenue tree plantation at offiers colony at Moulali during the year 2016-17-Reg & HMR- Raising avenue plantation From Moulali to ECIL & Moulali Nacharam road via Mallapur, during the year 2016-17-Reg & HMR- Raising avenue Tree plantation at RTC colony Moulali, during the year 2016-17-Reg. 12-05-2016
Raising of Avenue Plantation along Corridor sides, adjacent Lead roads, colonies & other Institutions from Miyarpur to Khairathabad for the year 2016-17. 12-05-2016
Raising of Avenue Plantation along road sides, adjacent Lead roads, colonies & other Institutions on Hyderbad-Medak-Bodhan road for the year 2016-17. 12-05-2016
Raising of Avenue Plantation along road sides, adjacent Lead roads, colonies & other Institutions on I)NH-44 to Alwal road II)NH-44 to Bollaram Rly for the year 2016-17. 12-05-2016
A venue plantation in gaps of either side of NH-65 from LB Nagar Setara Hotel KM 14/0 to HP pertrol pump near Sangi junction Koheda cross Road and Raghava nagar & Tirmula colony at Meerpet under Haritha Haram during 2016-17. 12-05-2016
A venue Plantation in gaps portion on side medians from Chaitanyapuri to LB Nagar including surrounding colonies and Seven Hills Colony at Meerpet under Haritha Haram during 2016-17. 12-05-2016
Construction of foot paths from KCP Junction to Khairatabad Junction, Hyderabad in Metro Rail Corridor-I 02-05-2016
Construction of foot paths from Nirankari Bhavan to Ravindra Bharathi at Lakdikapool, Hyderabad in Metro Rail Corridor-I 02-05-2016
HMR-Road cutting restoration by laying CC from Kachiguda x roads to Time cafe on RHS where 600mm dia sewer line taken up by LTMRHL to facilitate construction of pier no.NARSUBNP07 to NARSUBNP11 in Stage-6/1, Corridor-II & HMR- Repairs , maintenance and formation of BT road infront of Big Bazaar at Kachiguda x roads to facilitate the construction of metro pier no.NARSUBNP12 &13 to facilitate metro works in corridor-II 29-04-2016
HMR - Enquiry for procurement of printing and general stationery items 28-04-2016
Re-construction of drawing hall-1 on newly constructed WTTI in Taruni Complex - Hyderabad 27-04-2016
Re-construction of drawing hall-3 on newly constructed WTTI in Taruni Complex - Hyderabad 27-04-2016
Re-construction of drawing hall-2 on newly constructed WTTI in Taruni Complex - Hyderabad 27-04-2016
HMR- Providing Main gate and Fencing over compound wall in Imlibum Park for relocation of existing structure in the proposed MGBS Depot. 27-04-2016
Formation of new BT road (free left) splay portion at Upkaar junction, Picket, Secunderabad by Hot Mix Process to facilitate Metro works in corridor-II, HMR 27-04-2016
Item-1 HMR - improvements to footpath greenery and Landscaping etc., at parade grounds and Gymkhana grounds from Metro pillar PGPP 6 to 22 & 23 to 31 in stage III of Corridor III Secunderabad. & Item-2 HMR- Construction of servant rooms and providing pathway at HMR Training Institute at Hydernagar, Corridor-I. 16-04-2016
Providing Compound Wall at SPG Church to avoid nuisance and to protect the widened portion from Pier o PRGSCRNP35 to PRGSCRNP38 in Secunderabad in corridor-II 06-04-2016
HMR-Corridor-II-Dismantling of the affected portion of Kamat Hotel building under road widening from Andhra Bank Junction to Puthlibowli Junction in corridor-II to facilitate metro works & HMR-Corridor-II-Dismantling of the affected portion of Municipal shopping complex building under road widening from Andhra Bank Junction to Puthlibowli Junction in corridor-II 29-03-2016
Construction of additional accommodation to Government High School, Yousufguda, Hyderabad (Re-tendering) 26-03-2016
HMR - Construction of Compound wall at Madhuranagar Metro Station, Corridor-III 09-03-2016
Providing Hand Railing to the foot paths and the other amenities to the proposed development of Louise Braille park at Malakpet Quarters, Hyderabad in Metro Rail Corridor-I 04-03-2016
Providing water supply facilities to Dobhighat(Chaderghat Darwaza) near City Model School, Chaderghat, HYD in Metro Corridor-I. 24-02-2016
Providing C.C Pavement and construction of Sheds (balance work) for washing ghats to IMLIBUN Dobhighat at MGBS, HYD in Metro Corridor-I. 24-02-2016
HMR-Corridor-I-Further maintenance of Bougainvilla, Avenue trees and Translocated Ravi trees from Chaithanya puri to L.B.Nagar X Road and maintenance of Avenue plants raised during 2014-15 up to June-2016.
I. 339 avenue plants existing from Chinthalkunta check post on NH 65 to Sagar road and Panchayath Raj Teaches Colony Bus Stop on Sagar Road to Flytech Academy.
II. 625 avenue plants existing in high visibility areas from Deerpark Vanasthalipuram to Pedda amberpet.
III. 526 avenue plants existing in high visibility areas from L.B.Nagar to Deer park and Sushma Theatre to Kamineni Hospital on Nagole road.
24-02-2016
Invitation for Appointment of Statutory Auditors for Hyderabad Metro Rail Project 23-02-2016
Laying new BT road and construction of foot path in front of majestic garden road at Bharatnagar 18-02-2016
Construction of compound wall at petrol pump near HMR Commercial Complex at Puthlibowli, Corridor-II, HMR 12-02-2016
HMR - Construction of Compound wall at Madhuranagar Metro Station, Corridor-III 12-02-2016
5 miscellaneous trees of Parkia biglandulosa(1 no.) and peltophorum (4 Nos) existing on the right side of road Andhra Bank to Osmania Medical college falling in the alignment of Corridor-II Stage 6/2 Narayanguda to MGBS 10-02-2016
Construction of first floor, compound wall & toilet block in new Government Junior College at YMCA, Secunderabad affected under road widening in corridor-II (Balance Work). 09-02-2016
Construction of Wholesale Stalls, Frozen Stalls, Exclusive Stalls and Toilet Blocks of Rythu Bazar under Metro Rail station at Bharath Nagar, Hyderabad & Construction of Retail Stalls of Rythu Bazar under Metro Rail station at Bharat Nagar, Hyderabad 08-02-2016
The Landscaping of the Louis Braille park at Moosarambagh and maintenance in Corridor-I - (Miyapur to L B Nagar). 08-02-2016
HMR-Engg-Providing 150mm thick C.C road in the Widened portion from Paris Opticals to Chitra diagnostic centre (Right side) at Chikkadpally" from Narayanguda to RTC x roads to facilitate metro works in corridor - II & HMR-Engg-Providing 150mm thick C.C road in the Widened portion from Mukunda opticals to Sri sai restaurant and bar(left side) at Chikkadpally from Narayanguda to RTC x roads to facilitate metro works in corridor - II (Item.No.2) 06-02-2016
HMR - Translocation of Ficus Religiosa tree 1 No existing in the Mortuary of Old Gandhi Hospital. 11-01-2016
Tenders
Tenders
Start Date
Start Date
HMR-Corridor-I-Further maintenance of Bougainvilla, Avenue trees and Translocated Ravi trees from Chaithanya puri to L.B.Nagar X Road and maintenance of Avenue plants raised during 2014-15 up to June-2016.
I. 339 avenue plants existing from Chinthalkunta check post on NH 65 to Sagar road and Panchayath Raj Teaches Colony Bus Stop on Sagar Road to Flytech Academy.
II. 625 avenue plants existing in high visibility areas from Deerpark Vanasthalipuram to Pedda amberpet.
III. 526 avenue plants existing in high visibility areas from L.B.Nagar to Deer park and Sushma Theatre to Kamineni Hospital on Nagole road.
22-2-2016
Providing internal CC road from Indore Stadium to Swimming pool of Saroornagar Indoor Stadium Sports Complex, Hyderabad 29-12-2015
Construction of Pedestal for Erection Of Bronze made Statue of "Sri Lalbahadur Shastri", from L.B. Nagar station Arm-I, on corridor-I. 21-12-2015
Supply, transportation, erection, testing and commissioning of 2 Nos 8 passenger fully automatic lift with 6 stops, Stainless steel car, central opening door system with vinyl flooring with regeneration system with all atandard applicable features with ARD (Automatic rescue device) for Hyderabad Metro Rail Corporate office, Rasoolpura, Secunderabad (2nd Call) 19-12-2015
Construction of Pedestal and Erection of Bronze made statue of "sir Louise Braille", in Louise Braille park at Malakpet 17-12-2015
DISMANTLING OF EXISTING WTTI COLLEGE IN THE PREMISES OF TARUNI COMPLEX AT MADHURANAGAR 14-12-2015
Construction of Pedestal and Erection of Bronze made statue of ''sir Louise Braille'', in Louise Braille park at Malakpet 14-12-2015
Repairs and maintenance of BT road by hot mix process between Crystal Restaurant at RTC x roads to Gulshan hotel at Chikkadpally in Stage-6/1, Corridor-II 11-12-2015
HMR- Providing BT road by hot mix process infront of Raja Furniture to Sri Datta Sai Complex (Dominos) at RTC x roads to facilitate metro works in corridor-II & HMR-Repairs and maintenance of BT road by hot mix process infront of Co-optics to sapthagiri Theatre, Police outpost, muscle power gym to Golkonda x roads & Srinivasa Bakery to Venkateshwara sweets from Musheerabad to RTC x roads to facilitate metro works in corridor-II (item.No.2) & HMR- Repairs and maintenance of BT road by hot mix process between Kachiguda x roads and Golkonda x roads to facilitate metro works in corridor-II 10-12-2015
Providing House Keeping to Metro Rail Bhavan, Annexe building and MRI office at Kukatpally for the period 01-01.2016 to 31.12.2016 & Construction of compound wall to PG college, SP road in stage-3,Corridor-III, Secunderabad 26-11-2015
Providing C.C. Road in various streches in the reach from MD.Khan Jewellers to Murthy Studio at Nampally(LHS) in Metro Rail Corridor-I 16-11-2015
Providing C.C. Road in various streches in the reach from Chappel road to lata talkies junction at Nampally(RHS) in Metro Rail Corridor-I 16-11-2015
HMR - Construction of Compound wall to properties at Pier No. JCPT p-8 L/s at Road No. 36 Jubilee Hills, Stage-IV, Corridor-III 16-11-2015
Providing security services at Metro Rail Bhavan and its annex, P&C areas and other locations for the year 2015-2016 09-11-2015
HMR-Corridor-111 Landscaping at Gymkhana Ground planting and maintenance of Ornamental and flowering shrubs Tall plants etc., under Span Nos. 23-24 to 30-31 infront of Gymkhanna Grounds, Corridor-111 during 2015-16 and Maintenance upto June, 2016. 02-11-2015
HMR-Engg-Road cutting restoration by laying CC from Azad cafe to Raja Deluxe where 500mm dia sewer line taken up by LTMRHL in Stage-6/1, Corridor-II" & HMR-Engg-Road cutting restoration by laying CC from Suman chit fund to Golkonda x roads where 600mm dia sewer line taken up by LTMRHL in Stage-6/1, Corridor-II" & HMR-Engg-Road cutting restoration by laying CC from Gulshan Hotel to RTC x roads where 600mm dia sewer line taken up by LTMRHL in Stage-6/1, Corridor-II" & HMR-Engg-Road cutting restoration by laying CC from Universal Bakery to Musheerabad where 400mm dia sewer line taken up by LTMRHL in Stage-6/1, Corridor-II & Construction of approach road (CC pavement) to Dhobighat at MGBS behind Integrated School, Chaderghat, Hyderabad in Metro Rail Corridor-I. 26-10-2015
HMR - Construction of Compound wall to DEO - Cantonment Office in Stage-3, Corridor-III, Sec-bad 14-10-2015
Providing and installing fire fighting hydrants for HMR commercial complex at Puthlibowli, Hyderabad 13-10-2015
Providing BT surface to internal roads for HMR commercial complex at Puthlibowli, Hyderabad. 08-10-2015
Construction of balance compound wall (Gap portion) of Osmania Medical College in between Royal Traders & Basra Hotel, Rangamahal ''y'' junction, Hyderabad. 07-10-2015
Dismantling of affected property bearing H.Hno. 1-11-251/19/A2 to A3 and 7-1-23 (RAK Ceramics building and Meena Jewellery Buildings) Begumpet in Stage-3, Corridor-III, HMR 06-10-2015
Drilling of Borewell in Louise Braille park at Malakpet Quarters, Musarambagh in Metro Rail Corridor-I 05-10-2015
Providing MS Fencing Grills around the temple near office of Director of Economics & statistics, Khiratabad in Metro Rail Corridor-I 05-10-2015
Emergency repairs and maintenance in the stretch from KCP junction to Lakdikapool Metro Rail Corridor-I 21-09-2015
Emergency repairs and maintenance in the stretch from Gandhi Bhavan to Rangamahal Jn in Metro Rail Corridor-I 21-09-2015
Repairs and recarpetting of BT road in the reach from Dilsuknagar Bus Depot to LB Nagar cross Road of Metro Rail Corridor - I. 21-09-2015
Repairs and recarpetting of BT road in the reach from Malakpet Railway Station to New Market (Mahabub Ganj) of Metro Rail Corridor - I. 21-09-2015
Repairs and recarpetting of BT road in the reach from New Market (Mahabub Ganj) to Dilsuknagar Bus Depot of Metro Rail Corridor - I. 21-09-2015
Repairs and recarpetting of BT road in the reach from Zeeshan Hotel to Naigara Hotel Jn, Chaderghat in Metro Rail Corridor - I. 21-09-2015
Repairs to B.T Carriageway from Erragadda-Khairatabad stations. 18-09-2015
Repairs to B.T Carriageway from Miyapur-Erragadda stations. 18-09-2015
Birla Putty finish along with good colour scheme to external faces of Integrated School Complex, Chaderghat 18-09-2015
HMR- Repairs and maintenance of BT road by hot mix process between Kachiguda x roads and Golkonda x roads" to facilitate metro works in corridor-II. 16-09-2015
HMR- Repairs and maintenance of Corridor-II road carriage way by engaging men & machinery and material -Reg 16-09-2015
Repairs and maintenance of road by providing interlocking concrete blocks pavement at Malakpet RuB in Metro Rail Corridor-I 09-09-2015
Construction of foot paths in the proposed development of louise Braille park at Malakpet Quarters, Hyderabad in Metro Rail Corridor-I 09-09-2015
Construction of approach road ( cc pavement ) to HMWS&SB office Khairatabad in Metro Rail Corridor-I, i.e., Miyapur to L.B.Nagar, Hyderabad 09-09-2015
Road restoration with BT over utility shifting from piers MGBMKLNP-16 to 19 near New Line Hospital & Niagara hotel at chaderghat in Metro Rail Corridor-I. [2nd call ] 07-09-2015
Birla Putty finish along with good color scheme to external faces of Integrated School Complex, Chaderghat 01-09-2015
HMR-Engg- Providing 150mm thick C.C road in the Widened portion at Bhoiguda Y junction infront of H.No.6-2-111/1 to H.No.6-2-112/1/1(Boston Cafe) in corridor-II & HMR-Engg- Providing 150mm thick C.C road in the Widened portion at Bhoiguda Y junction infront of H.No.6-1-9 & 108/3(Dandu Pentaiah property) in corridor-II. (Item.No.2). 28-08-2015
Plantation of trees along the Metro corridors and its catchment areas - at Osmania Medical college, Koti and NTR stadium, domalguda, Hyderabad, Corridor-I-HMR. 28-08-2015
Quotation Form - Details of Species and Specifications for Procurement of Plant Material - "Telangana ku Haritha Haram Programme". 28-08-2015
Proposed Shed for Meeting-cum-video conference Hall on Terrace & Security Room in Stilt Floor at MRO/RDO Building at Secunderabad & Providing footpath in front of the HMR COmmercial complex at Puthlibowli (SUb works 1. Providing Borewell 2. Providing Rain water harvesting pits). 26-08-2015
Construction of Sainik Aramghar in old Gandhi hospital premises, Secunderabad 26-08-2015
Construction of balance compound wall at Imlibun Dhobi Ghat at MGBS, Hyderabad 25-08-2015
Avenue plantation & Raising of single petal Neeriums in the central median of NH-65 from Vanasthalipuram to Pedda Amberpet during 2015-16 under Haritha Haaram 21-08-2015
Repairs to B.T carriageway from Miyapur - Khairatabad stations. 21-08-2015
Providing electrification to HMR Training Institute at Hydernagar in Corridor-I, HMR 20-08-2015
HMR-Corridor-II-Dismantling the affected portion of 2 (Two) properties bearing no. 6-2-112/1/1 (Sri Jangir Khan) & 6-2-112/1 (Smt Sarada) situated at Bhoiguda Y-junction of corridor-II & HMR-Corridor-II-Dismantling the affected portion of property bearing H.no. 6-4-6/3 to 5 situated at Opp: New Gandhi Hospital between Bhoiguda "Y" Junction and Musheerabad Junction of corridor-II & HMR-Corridor-II-Dismantling the affected portion of property bearing no. 6-4-7&:1/A (Sri Narayan Patel & Others) situated at Opp: New Gandhi Hospital of corridor-II & HMR-Corridor-II- Dismantling the affected portion of 2 (Two) properties bearing H.no. 6-2-111 (Sri I.S.Seshavatharam) & 6-2-112 (Sri K.Srinivas Reddy & Others) situated at Bhoiguda Y-junction of corridor-II & HMR-Corridor-II-Dismantling the affected portion of property bearing H.no. 6-4-2/1 to 5 (Sri V.Srinivasa Reddy & Others) situated at Opp: New Gandhi Hospital of corridor-II 18-08-2015
Dismantling of compound wall of Graveyard at Ameerpet main Road, corridor-I 05-08-2015
Widening the carriageway at Grave Yard (Under corridor-I) Ameerpet 05-08-2015
Construction of compound wall at Shalimar Junction Grave Yard (Under Corridor-I) Ameerpet Right side 05-08-2015
Repairs and recarpetting of BT road in the reach from Khaiaratabad Metro station to Bharat petrol pump of Metro Rail Corridor - I 27-07-2015
Repairs and recarpetting of BT road in the reach from Khaiaratabad ( Shadan college) to Lakdikapul Metro station of Metro Rail Corridor - I 27-07-2015
Construction of Internal partition walls and finishings to Training Institute in Corridor-I - HMR 31-07-2015
HMR-Providing footpath along the road & inside the Nursery at Hydernagsr in Corridor-I -Reg.(recall) 29-07-2015
Raising of Avenue Plantation (3000 plants) at different S.C.Railway locations at Nampally & Kachiguda during 2015-16.(recall) 25-07-2015
Plantation of trees along with the Metro Corridor Catchment Area from Metuguda to Begumpet, Corridor-III, HMR 22-07-2015
Providing Shed for mid day meals outside the Integrated School Complex Building of Govt.City Model High School Chaderghat, near MGBS, Hyderabad Corridor-I 21-07-2015
Raising of Avenue Plantation (3800 plants) in high visibility areas along the corridor & catchment areas at different locations from L.B Nagar, Nagole up to Mettuguda and at Suchitra junction, Bowenpally during 2015-16. 17-07-2015
Raising of Avenue Plantation (3000 plants ) at different S.C Railway locations at Nampally & Kachiguda during 2015-16. 17-07-2015
Raising of Avenue Plantation (3500 plants) at different S.C Railway locations at Mettuguda & Secunderabad during 2015-16 & Raising of Avenue Plantation (3500 plants) at different S.C Railway locations at Rail Nilayam and other Railway areas in Secunderabad during 2015-16 17-07-2015
HMR - Providing footpath along the road inside the Nursery at Hydernagar in Corridor-I Reg. 13-07-2015
Plantation of trees along the Metro corridors and its catchment areas in Vignanpuri residential colony, Andhra bank colony, Defence colony, Venkatramana colony, Dwaraka nagar colony and Panchayath teacher's colony under Haritha Haaram programme, Corridor-I-HMR & Raising of avenue plantation with plants on road sides, road side colonies & other institutions on NH-44(Suchitra X-road to kompally bridge) road for the year 2015-16 under Haritha Haaram programme & Raising of avenue plantation with plants along corridor sides, adjacent lead road sides, colonies & other institutions from Miyapur to Khairatabad for the year 2015-16 under Haritha Haaram programme & Plantation of trees in the reach from Kacheguda X road to JBS Secunderabad in Corridor-II 10-07-2015
Plantation of trees along the Metro Corridors and its Catchment Area in Shiva Hills colony Bus stop to TKR institutions, Hanuman Nagar & Vinayaka Hiills under Haritha Haram program 08-07-2015
Avenue Plantation with plants on Road sides, adjacent Lead roads, colonies & other Institutions on NH-44 to Qutubullahpur Muncipal Office for the Year 2015-16 08-07-2015
Avenue Plantation with plants along road sides, adjacent Lead roads, colonies & other Institutions on Hyderabad-Medak-Bodhan road for the year 2015-16 08-07-2015
Repairs and recarpetting of BT road in the reach from New Market station to Chaitanyapuri station of Metro Rail corridor - I 04-07-2015
Repairs and recarpetting of BT road in the reach from Chaitanyapuri to LB Nagar of Metro Rail corridor - I 04-07-2015
Repairs and recarpetting of BT road in the reach from Malakpet RuB to New Market station of Metro Rail corridor. 29-06-2015
Repairs and recarpetting of BT road in the reach from MJ Market to Rangamahal Junction of Metro Rail corridor-I. 29-06-2015
Supply and fixing of Pre-cast RCC divider blocks M-30 design mix using 10.95 kg steel as per morth specification and drawing including HMR embossed on both sides on three corridors - HMR. 27-06-2015
Repairs to B.T carriageway from JNTU-Kukatpally stations. 26-06-2015
Road cutting restoration by laying CC from MSHMSHST05 ( near Musheerabad temple) to MSHRTCNP17 (opp. to Care Hospital) where the water supply line taken up in stage-6/1,Corridor-II (Reach No 1) - 2nd call. 26-06-2015
Repairs to B.T carriageway from Kukatpally-Erragadda stations. 26-06-2015
Repairs to B.T Pot holes with Bituminous Macadam between Miyapur-Khairathabad stations . 26-06-2015
Dimanting of Pvt Properties Bearing No's :5-8-165,165/A&165/1 to 5,5-8-108/1 & 2,108/A/1,108/B & 5-8-107/A?2,11-6-215,212,16-2-681/5 & 16-2-681/1 in the stretch from Public garden X Road to Lata Talkies Jn & New Market Metro Station (RHS) of Metro Rail Corridor -I i.e.,Miyapur to L.B.Nagar ,Hyderabad. 26-06-2015
Providing C.C.Road at Moazzamjahi Market Junction in Metro Rail corridor-I,i.e.,Miyapur to LB nagar,Hyderabad 26-06-2015
Providing C.C. Road on existing Footpath of (NH-65)(RHS) at Nampally in the reach from public garden X road to nampally station x road in Mwtro Rail Corridor-I,i.e.,Miyapur to LB nagar , Hyderabad 26-06-2015
Providing C.C. Road in the stretches from Allwyn furniture to Mumtaz furniture on RHS and infront of gopi Hotel & Bombay Bar LHS at Nampally in Metro Rail Corridor-I, i.e, Miyapur to Lb nagar, hyderabad 22-06-2015
Providing C.C. Road from H.No: 5-8-326,5-8-326/1,2 & 5-8-324 to 325, 5-8-270, 5-8-268/271 & 5-8-56/57 (LHS) at Nampally in the reach from public garden X road to Nampally station X road in Metro Rail Corridor-I, i.e., Miyapur to L.B nagar, Hyderabad 22-06-2015
Providing C.C .Road on existing Footpath of(NH-65) LHS at Nampally in the reach from public garden X road to nampally station x road in Metro Rail Corridor-I,i.e,Miyapur to LB nagar,Hyderabad 22-06-2015
HMR-Repairs and maintenance of road at Golkonda x roads ,Musheerabad by providing interlocking concrete blocks pavement as a temporary measure to facilitate metro works in corridor – II.&HMR-“Repairs and maintanence of BT road by HMP process in the damaged stretches between Bhoiguda RUB to Y-junction, Bhoiguda” to facilitate metro works in corridor – II(Item.No.2).&HMR-“Repairs and maintanence of BT road by HMP process in the damaged stretches between Golkonda x roads to YMCA Narayanaguda” to facilitate metro works in corridor – II(Item.No.3).&HMR-“Repairs and maintanence of BT road by HMP process in the damaged stretches between Musheerabad to Spencer’s Super Market “ to facilitate metro works in corridor-II (item.No.4) 18-06-2015
Providing compound wall at front face of state Women Rescue home in the premises of Taruni complex-Madhuranagar 17-06-2015
Providing BT road by hot mix process in the widened portion from Pie No PRGSCRNP35 to PRGSCRNP38 at SPG Church to facilitate metro works in corridor-II & Road cutting restoration by laying CC from MSHMSHST05(near Musheerabad temple) to MSHRTCNP17 (opp. to Care Hospital) where the water supply line taken up in stage-6/1,Corridor-II(Reach No 1) & Road cutting restoration by laying CC from MSHRTCNP17(opp. to Care Hospital) to MSHRTCNP17 (Lepakshi Emporium opp. to Chikkadpally P.S) where the water supply line taken up in stage-6/1,Corridor-II(Reach No II) & Road cutting restoration by laying CC from MSHRTCNP32(Lepakshi Emporium opp. to Chikkadpally P.s) to RTCRTCST03(RTC X roads) where the water supply line taken up by LTMRHL (Reach NO III) 12-06-2015
Providing plantation in the central median below viaduct from Nagole to Habsiguda and for Uppal Metro Rail station including maintenance for one year in Metro Rail corridor-III of stage-1 09-06-2015
Providing of modern lighting at Nagole Metro rail station for landscaping works proposed by HMR. 04-06-2015
Development of road access by providing footpath, kerb etc., at Uppal Junction in Corridor-III, HMR 04-06-2015
PRoad restoration with BT over utility shifting from piers mgBMKLNP-14 to 18 near City model high school & Niagara Hotel near Chaderghat in Metro Rail Corridor-I, Hyderabad. 03-06-2015
Providing C.C. Road on (RHS) of OMC Metro station opp to Sultan Bazar Traffic Police Station in the reach from MJ Market to putlibowli X Roads in Metro Rail Corridor-I, i.e., Miyapur to L.B. Nagar, Hyderabad. 03-06-2015
Repairs to B.T carriageway from Miyapur-Kukatpally stations. 03-06-2015
Repairs to B.T carriageway from Erragadda-S.R Nagar stations (Under corridor-I). 03-06-2015
HMR-Engg-Providing 150mm thick C.C road in the Widened portion infront of Prashanth Theatre in Secunderabad affected under 120Ft road widening from YMCA fly over to Secunderabad station in corridor-II & HMR-Engg-Providing 150mm thick C.C road in the Widened portion infront of property bearing no.1-1-149 (adjacent to padmini hotel) in Secunderabad affected under 120Ft road widening from YMCA fly over to Secunderabad station in corridor-II. 02-06-2015
HMR-"Dismantling the affected portion of property bearing no H.No.1-1-258/27, 28 & 29 (Vani medical hall, Brahma kumari's center & others) situated at RTC 'x' roads to Narayanguda stretch of corridor-II & HMR-"Dismantling the affected portion of property bearing no H.No.3-4-432 (BCMR Towers) situated at Narayanguda 'x' roads to Kachiguda 'x' roads stretch of corridor-II & HMR-"Dismantling the affected portion of property bearing no H.No.8-2-226 to 230 (Sreenidhi Hotel) situated at Secunderabad Clock Tower stretch of corridor-II. 02-06-2015
Providing C.C.Road on widened portion from H.no. 6-2-928, 6-2-924/96, 6-2-921 & 6-2-1011/1 (RHS) at Khairatabad in the reach from Khairatabad to Lakdikapool in Metro Rail Corridor-I, i.e., Miyapur to L.B.Nagar, Hyderabad. 20-05-2015
Providing C.C.Road on Widened portion of existing BT road (NH-65) from H.no.5-8-327/C, 5-8-327,5-8-327/B & 5-8-263 (LHS) at Nampally in the reach from ravindra Bharati to MJ Market in Metro Rail Corridor-I, i.e., Miyapur to L.B. Nagar, Hyderabad. 19-05-2015
Providing C.C.Road on widened portion from H,no. 6-2-979 & 6-2-985 (LHS) at Khairatabad to Lakdikapool in Metro Rail Corridor-I, i.e., Miyapur to L.B.Nagar, Hyderabad. 19-05-2015
Estimate for Repairs to B.T carriageway from Khairatabad-S.R Nagar stations (Under corridor-I). 16-05-2015
Repairs & Maintenance by recarpetting the existing BT road in stretch from Khairatabad to Rangamahal junction in Metro Corridor-I. 16-05-2015
Dismantling of Properties Bearing No's : 5-8-327/C to 423, 5-4-416 to 419, 11-6-204/205, 5-8-327, 5-8-327/B, 5-4-111, 5-4-416 to 419, 5-8-324, 5-8-230/A,B,C1&2 situated in the reach from Ravindra Bharati to MJ Market X road of Corridor-I, i.e., Miyapur to L.B.Nagar, Hyderabad. 07-05-2015
Dismantling of Properties Bearing No's : 5-8-157 to 160, 5-9-162/4, 5-8-162/1, 5-8-163/6, 5-8163/D, 5-8-163/B, 5-8-111, 5-8-111/1, 5-4-412, 5-8-230,4 & 230/3,5,6,7. situated in the reach from Ravindra Bharati to MJ Market X road of Corridor-I, i.e., Miyapur to L.B. Nagar, Hyderabad 07-05-2015
Supply and filling up of red soil, manures etc. in the central median below the viaducts for development of Greenery / Landscaping under viaducts between Nagole and Mettuguda in Corridor-III(recall) 07-05-2015
Manufacture, supply and delivery of RCC precast panels of size 1200 X 600 X 50 mm to central median from Uppal Metro Rail Station to Habsiguda Metro Rail Station in Cirridor-III(recall) 07-05-2015
HMR - Construction and improvement of the existing road with BT by HMP in Hydernagar Nursery Miyapur abutting to Corridor-I 06-05-2015
Providing staff room to WTTI Hostel in the premises of Taruni Complex-Madhuranagar. 06-05-2015
Construction of wall along the periphery of proposed Sri Bramaramba Mallikarjuna swamy Temple in the Premises of JNTUH, kukatpally, HMR. 06-05-2015
Construction of wall to the office of Director of Economics and Statistics (G+2) at khairatabad affected in road widening, in R/S of corridor-I, HMR. 06-05-2015
Dismantling of properties in road No. 5, Jubilee hills, Corridor-III, HMR 05-05-2015
Dismantling of properties bearing No's from 8-2-231/A/16( Sketch No 155 to 8-2-231/11/A(Sketch No 158) at Sri Krishna Nagar, Corridor-III, HMR 05-05-2015
Dismantling of properties bearing Nos from 8-2-231/A/7/1( Sketch No 162 to 8-2-231/A/3(Sketch No 165) at Sri Krishna Nagar, Corridor-III, HMR 05-05-2015
Dismantling of properties bearing Nos from 8-2-231/A/10/2( Sketch No 159) to 8-2-231/A/9/A(Sketch No 161) at Sri Krishna Nagar, Corridor-III, HMR 05-05-2015
HMR-Providing MS Strautural frame work with Galvalume sheeting for Construction of Training center at Hydernagar Nursery Miyapur abutting to Corridor-I Reg 01-05-2015
HMR-Providing MS Strautural frame work with Galvalume sheeting for Construction of Training center at Hydernagar Nursery Miyapur abutting to Corridor-I Reg 01-05-2015
Providing slip road with C.C.Pavement and construction of masonry Wall in widened portion at rear side of Pochamma Edugudlu and HMWS&SB Khairatabad in the reach from Nirankari Bhavan to Vishweshwaaraiah statue in stage-5/1 R/S of corridor-I, HMR. 25-04-2015
Construction of balance compound wall (Gap portion) of Osmania Medical College in between Royal traders & Basra Hotel, Rangamahal "Y" junction, Hyderabad 25-04-2015
Construction of compound wall to defence CE(FY) on S.P road, Corridor-III-HMR & Re-construction of compound wall to HMWs&SB reservoir and Office at Tarnaka in stage-1, Secunderabad, Corridor-III-HMR. 24-04-2015
Supply and filling up of red soil, manures etc. in the central median below the viaducts for development of Greenery / Landscaping under viaducts between Nagole and Mettuguda in Corridor-III & Manufacture, supply and delivery of RCC precast panels of size 1200 X 600 X 50 mm to central median from Uppal Metro Rail Station to Habsiguda Metro Rail Station in Corridor-III. 23-04-2015
Improvements to central median from Uppal Metro Rail station to Habsiguda Metro Rail station(part-A) in Corridor-III & Improvements to central median from Habsiguda Metro Rail station to Mettuguda Metro Rail station(part-B) in Corridor-III. 20-04-2015
Construction of wall to the office of Director of Economics and Statistics (G+2) at Khairatabad affected in road widening, in R/S of corridor-I, HMR. 18-04-2015
Dismantling of 6 properties at Yousufguda Metro Station, Stage-4, Corridor-III, HMR. 08-04-2015
Dismantling the affected property under road widening from senior Section Engineer (Elec) office to Lekha Bhavan, Secunderabad, Stage-3, Corridor-III, HMR. 08-04-2015
Formation of service roads on LHS of Nagole Metro Rail station in Corridor-III & Formation of service roads on RHS of Nagole Metro Rail station in Corridor-III & Development of Foot path and landscaping from paradise junction to Military memorials at Gymkhana grounds from Metro pillar PGPP 23 to 31, in stage III of Corridor III, Secunderabad, HMR 07-04-2015
Dismantling of properties Bearing No's: 5-8-263, 16-6-73, 16-7-328/B, 16-2-681/5 & 16-2-681/1 in the reach from Nampally to New Market Metro Station Hyderabad in Metro Rail Corridor-I, i.e., Miyapur to L.B. Nagar, Hyderabad. 07-04-2015
Dismantling of property bearing no. 1-48/2/3A to 3D, 1-48/A/2A, 1-48/2/14, Madhapur, COD, Stage-4, Corridor-III, HMR 02-04-2015
Dismantling of affected property under road widening at SBH Begumpet (Veeteshwar H. No. 1-10-63/1/3&63/4&5) Chintha Vari Building (Ashok Kumar H. No. 1-10-63/1/3 & 63//4&5), Stage-3, Corridor -III, Secunderabad 02-04-2015
Dismantling of affected property under road widening bearing H. No. 9-3-14 (Guthikonda Lodge) and H. No. 9-3-14(Delight Hotel) situated at Secunderabad, Stage-3, Corridor-III, HMR 02-04-2015
HMR - Providing Electrification to old GHMC office (which is now alloted to Gopalapuram Police Station) 02-04-2015
Construction of Compound wall to the Office of HMWS&SB at Khairatabad affected in road widening in corridor-I. 01-04-2015
Construction of P&CA Complex at Paradise station on corridor-III in the open land in front of MRO Office at Secunderabad (5 floors with Mezzanine levels & 2 cellars) 30-03-2015
Providing C.C. pavement in widened portion in the stretch from Nirankari Bhavan to Vishweshwaraiah statue in stage 5/1, L/S and R/S of corridor-I, Hyderabad 24-03-2015
Construction of Compound wall at GHMC ward office Yousufguda for relocating the existing structures in proposed road widening for traffic diversion in stage-IV , Corridor-III, HMR 24-03-2015
Construction of office of Asst. Commissioner of police, Traffic - IV, West Zone at MJ Market X road, Hyderabad in Metro Rail Corridor - I. 20-03-2015
Re-construction of compound wall to Andhra Pradesh State Ware Housing Corporation affected under 120 Ft road widening from Chillkalaguda x roads to Musheerabad Jn in corridor-II 20-03-2015
Providing 150mm thick CC road in the widened portions of certain properties situated Corridor - II 20-03-2015
Dismantling the affected portion of certain properties of Corridor-II 16-03-2015
Development of road access at LHS by providing Service roads, Busbays and etc at Uppal Metro Rail station in Corridor-III 13-03-2015
Repairs to Old GHMC Building to accomodate Gopalapuram Police Stations at S.P.Road, Sec-bad in Metro Corridor-III, HMR 12-03-2015
Dismantling the affected portion of certain properties along Corridor-II. 10-03-2015
HMR-Enquiry for procurement of printing and general stationary items - quotations called for - Regarding. 10-03-2015
HMR-Shifting of Utilities by the concessionaire-Removal & Hand over of High masts and the balance light poles, large advertisement boards and Uni-advertisement boards within the cantonment area from JBS to Parade Ground stretch of corridor-II. 05-03-2015
HMR-Engg.-Dismantling the affected portion of 1 (One) property bearing no.1-1-147/1, 1/A (Padmini Hotel) situated newar clock tower at Secunderabad stretch of corridor-II. (Item.No.1) & HMR-Engg.-Dismantling the affected portion of 1 (One) property bearing no.1-1-80 (Suman Chit fund and adjacent RICH Collection Building) situated at RTC x roads stretch of corridor-II. (Item.No.2) 05-03-2015
Dismantling the affected portions of certain properties situated in Corridor-II 26-02-2015
HMR-"Re-construction of compound wall, canteen, gates, etc in BSNL office building" affected under road widening from Musheerabad to Narayanguda in corridor-II. 25-02-2015
HMR-Corridor-II-Dismantling the staff quarters situated in Old Gandhi Hospital near Mortuary at Secunderabad. 23-02-2015
Providing 150mm thick CC road in the Widened portion infront of Mohammedia Function Hall situated at Musheerabad 'X' roads in corridor-II 24-02-2015
HMR-Metro Rail Inter Change station at MGBS - Relocation of existing structures / facilities of Bus Depot in the Imlibun Park-Construction of Retaining wall for proposed site & HMR-Metro Rail Inter Change station at MGBS - Relocation of existing structures / facilities of Bus Depot in the Imlibun Park-Construction of Compound wall for proposed site 21-02-2015
Dismantling of private properties H.Nos 6-2-953/A,6-2(Telegraph office), 6-2-939/1, 6-2-928, 6-2-924/96, 6-2-921, 6-2-(Shan college), 6-2-979,6-2-985, 6-2-940/1 for 100'-0'' wide road to facilitate execution of HMR project situated in the stretch from Nirankari Bhavan to Vishweshwaaraiah statue in Metro Rail Corridor-I, Hyderabad 10-02-2015
Providing C.C. Road for widened portion in front of H.No 5-1-494 to 495(Beside old Anuradha lodge) at Putlibowli Jn on RHS of Metro Rail corridor-I, Hyderabad. 10-02-2015
Dismantling of properties bearing no. 1-12/4, 2-37/3 and Sirisampada Apt. At Madhapur, Corridor-III, HMR 07-02-2015
Providing C.C. Road for widened portion near Chaderghat retary from H.No. 16-7-777/1 to 16-7-7779 on LHS of Metro Rail Corridor-I 05-02-2015
HMR-Corridor-II- Construction of care taker room, store room & water sump at cemetery near St. Thomas Tamil Cathedral church (SPG) under road widening at Secunderabad. 30-01-2015
Fixing of precast cement block kerb for development of Green track/ Green curtain infront of compound wall along the central drug laboratory and Chest Hospital etc., on Ameerpet to Kukatpally road, Corridor-I 29-01-2015
Improvements to central median from nagole X road in Corridor-III, HMR. 29-01-2015
Providing Fencing in front of HMWSS&SB taken over land at Hydernagar stage-I 13-01-2015
Carriageway widening & improvement works adjacent to Piers from YUGSCP-10 to YUGPP-14R, at Kirshna Nagar, Stage-IV, Corridor-III-HMR.
1. Road restoration at Hussain Sagar line from Krishnakanth park, Shalivahana Nagar 2. Road restorationat Yousufguda basti to Yousufguda checkpost.
09-01-2015
Development of road access by providing footpaths, kerbs, MS-Railing etc. at LHS of Uppal Metro Rail station, Corridor-III, HMR & Development of road access by providing footpaths, kerbs, MS-Railing etc. at RHS of Uppal Metro Rail station, Corridor-III, HMR & Development of road access by providing footpaths, kerbs, MS-Railing etc. at LHS of Nagole Metro Rail station, Corridor-III, HMR & Development of road access by providing footpaths, kerbs, MS-Railing etc. at RHS of Nagole Metro Rail station, Corridor-III, HMR 07-01-2015
Providing 150mm thick C.C road in the Widened portion at Bharath petrol outlet (Opp Centenary Baptist Church) in Secunderabad was affected under 1.20Ft road widening from YMCA fly over to Secunderabad station at Secunderabad & Providing 150mm thick C.C road in the Widened portion infront of H.No.3-4-553 to 557(Yamaha show room) and H.No.3-5-1064 to 1067 (Harika darshini, adjacent to Keshv Memorial School lane) at Narayanguda 06-01-2015
Providing 150mm thick C.C road in the Widened portion infront of YMCA Secunderabad & Construction of care taker room, store room & water sump at cemetry near St. Thomas Tamil Cathedral church (SPG) under road widening at Secunderabad 06-01-2015
Road Widening at FOB Opp. to St. Anns School in stage-3, Corridor-III, Secunderabad. 02-01-2015
Tenders
Tenders
Start Date
Start Date
Construction of Corporate Office building for HMR at Rasoolpura, Begumpet. Estimate Cost: Rs 1000 Lakh - Tender invited - reg. 30-12-2014
Construction of Toilet block P&C Area jail garden at Malakpet, in Metro Corridor-I, Hyderabad. 30-12-2014
Carriageway improvement from pier no.CDPNARNP15 to CDPNARNP23 and other places by laying BT carpet with hot mix process in stage-6/1-Corridor-II. 26-12-2014
Providing CC Road on widened portion of existing BT road (NH-65) from H.No: 11-6-204/205, 11-6-194/195 & 11-6-193 (RHS) at Nampally in the reach from Ravindra Bharthi to MJ Market in metro Rail Corridor-I, i.e., Miyapur to L.B Nagar, Hyderabad & Providing CC Road on widened portion of existing BT road (NH-65) from H.No: 11-6-192 (RHS) at Nampally in the reach from Ravindra Bharthi to MJ Market in metro Rail Corridor-I, i.e., Miyapur to L.B Nagar, Hyderabad. 24-12-2014
Drilling bore well for alternate accommodation of Govt. Girls H. School/Chaderghat in Metro Rail Corridor-I & Providing CC Road on widened portion of the road near Sultan Bazaar Traffic Police station in the reach from MJ. Market to Rangamahal Junction in metro Rail Corridor-I 18-12-2014
Widening and improvement of the carriageway R/S of the Maqbara at S.R Nagar by laying BT road by HMP, R/S of Corridor-I-HMR 18-12-2014
Construction and improvement of the diversion road at Ameerpet inter section on L/S of corridor-I from Ever car to Jade Intra by laying BT road by HMP Corridor-I-HMR 05-12-2014
Providing BT road by Hot Mix Process in the widened portion from Gandhi Hospital to Musheerabad junction to facilitate Metro works in corridor-II-HMR 27-11-2014
Carriageway improvement from pier no.CDPNARNP15 to CDPNARNP23 and other places by laying BT carpet with hot mix process in stage-6/1-Corridor-II. 26-11-2014
Providing CC Road for wideinging at Near Rangmahal Y Junction (4-7- 1121/6,7,8) & beside Jagannath Swami Temple (opp New Life Hospital), Hyderabad situated in the stretch from Rangmahal Junction to Chaderghat x road of Corridor - I, i.e., Miyapur to LB. Nagar, Hyderabad. 25-11-2014
Improvements to footpath, Kerb and Grill along Gymkhana grounds in stage-3 of Corridor-III-HMR 22-11-2014
The following are the consultants who are qualified for the Project Management Consultancy services for proof checking, construction supervision, Quality Control and Quality Assurance for "Construction of office accommodation for the Commissioner, WD&CW Dept, Regional Joint Director, WTTI and Hostel for the Durgabai Deshmukh Women college in the premises of Taruni Complex, Madhuranagar under Engineer Procurement and Construction (EPC) System" 19-11-2014
HMR-Corridor-III Development of greenary under viaducts at Tarnaka x roads corridor-III during the year 2014-15. 15-11-2014
Providing 150mm thick C.C road in the Widened portion infront of H.No.1-4-743 (Mohan Timber Depot) and along Govt. High school at Musheerabad to facilitate metro works in corridor - II & Providing 150mm thick C.C road in the Widened portion infront of H.No.3-5-1046 & 1047 to Lee Shop and H.No.3-5-1125 to 1129 to 3-5-1114/6 (Denim Shop) at Kachiguda 'X'roads to facilitate metro works in corridor-II. 15-11-2014
Providing MS fencing grill to median at Tarnaka in stage-1 of Corridor-III-Item-1 & Providing footpath from HMDA office to Tarnaka Metro Station in stage-1, Corridor-III, Item-II. 07-11-2014
Dismantling of Police quarters block in the premises of Shahinayathgunj Police quarters (G+3) at Goshamahal - HMR. 29-10-2014
Construction of SETWIN Training Centre at Aurobindo bala kendra building land at Musheerabad in lieu of dismantled building at AP judicial academy. 27-10-2014
Construction of Compound wall & Leveling the site located at City College where in the Police barracks are proposed. 24-10-2014
41 miscellaneous trees of neem, peltophorum, Kanugu, neem, Cassia siamea, Raintree, Terminalia arjuna, sapindus, Neredu, etc., (28 trees on the left side and 13 trees on the right side) existing between Old Bhoiguda to Bhoiguda 'Y' junction 17-10-2014
Construction of retaining wall for basement floor of the proposed Corporate Office building for HMR at Rasoolpura.Estimate Cost:Rs 85.00 Lakh-Tender invited-Reg. 23-09-2014
Providing of Avenue plantation with tall plants in the reach from ESI to Ameerpet (NH-65), Corridor-I, HMR, Hyderabad 22-09-2014
Translocation of Ravi trees in Ameerpet to MGBS to Stretch, Stage-V of Corridor-1 (Translocation and Transportation of 3 Ravi trees)(2nd Call) 06-09-2014
Appointment of consultant for project management consultancy services for proof checking, construction supervision, Quality control and Quality Assurance for "Construction of office accommodation for the commissioner ,WD&CW Dept, Regional Joint Director, WTTI and Hostel for the Durgabai Deshmukh Women College in the premises of Taruni Complex, Madhuranager-under Engineer Procurement and Construction(EPC) system 03-09-2014
Re-construction of compound wall, toilets & repairs to the left over building of Narayanaguda Police Station affected under road widening at YMCA Jn. in Corridor-II & Re-construction of compound wall to the premises of TSCPDCL at Musheerabad affected under road widening in Corridor-II 27-08-2014
Construction of Police barracks at Shahinayathgunj PS complex (rear side) & Designing accommodation for the Commissioner WD & CW Dept., Regional Joint Director, WTTI and Hostel buildings for the Durgabai Deshmukh Women's college in the premises of Taruni Complex, Madhuranagar - Under EPC system & Dismantling of Police quarters (Block No. 23 to 26 and 5 to 7) at Rasoolpura, Secunderabad 12-08-2014
Providing CC road in the Widened portion in front of Moazzamjahi Market X road (Old Traffic Police station, Goshamahal), Hyderabad situated in the stretch from Nampally to Putlibowli x road of corridor-I, i.e., Miyapur to L.B Nagar, Hyderabad. 04-08-2014
Providing Sheet fencing to P&C Area Land at Rasoolpura Police Quarters, Begumpet Secundrabad in Corridor-III 01-08-2014
HMR-Corridor-II-Translocation of 27 palm trees existing between JBS to Sweekar upkaar Bhavan 31-07-2014
Raising of Avenue Plantation with Tall plants in high visibility areas from RTC 'x' roads to Shankermatt and New Gandi Hospital to Narayanguda along the corridors and Catchment areas during 2014-2015 (Re-call). 28-07-2014
Providing security services at Metro Rail Bhavan and HMR P & C areas for the year 2014-15. 28-07-2014
Final list of empanelled dismantling contractors for the year 2014-15 & Dismantling of buildings from Dental Hospital to BJP office at Kukatpally, Corridor-I-HMR - Rs.5,00,000/- 17-07-2014
Raising of Avenue plantation with tall plants in Kakatiya Nagar Colony and School premises, Shaikpet Nala road, NH-65 to NH-44 via Balanagar Road and NH-44 to Qutubullapur Municipal Office. 05-07-2014
Raising of Avenue Plantation with Tall plants at locations namely Sushma Theater Vanasthalipuram to Hayathnagar, Malakpet race course to New Market, Akbarbagh to Chanchalguda, city Model School and Hari bowli x road to Chintalkunta junction during 2014-15. 04-07-2014
Raising of Avenue Plantation with Tall plants in high visibility areas, Location:1 Chintalakunta check post on Sagar road (500 No's) 2. Uppal cross road to Ramanthapur (200 No's) & RTC 'X' roads to Shankermatt and New Gandhi Hospital to Narayanaguda along the corridors and Catchment areas during 2014-15 04-07-2014
Raising of Avenue Plantation with tall plants along industrial part, Uppal and in the reach from SoI Metro Station to High Court Colony at Uppal in catchment areas of Corridor-III during the year 2014-15 & Raising of avenue plantation with tall plants in high visibility areas along corridors and catchment areas during 2014-15, Location: (1) Bowenpally to Kompally on NH-44 (200 No's), (2) Old-Bowenpally & Nearby colonies (175 No's), (3) RTC colony near and around of St.Andrews School at Old-Bowenpally (125 No's) 03-07-2014
Providing of Avenue plantation with tall plants in the reach from LB Nagar X Roads to Sushma theatre, Vanasthalipuram (NH-65) and JNTU to Khairtabad (NH- 65) 02-07-2014
Raising of Avenue Plantation with tall plants along the Corridor - III (Nagole to Mettuguda) catchment areas, high visibility areas, Location Road No.1, Jubilee hills to Shilparamam (300 Nos) and also along IRR between LB Nagar and Nagole during the year 2014-15 01-07-2014
Dismantling of office buildings in the Commissionerate WD&CW Dept-Buildings of the O/o of the regional joint Director, WD&CW dept in the premises of Taruni Complex at Madhuranagar, Hyderabad. 05-06-2014
Providing BT road on the Rangamahal 'Y' junction in corridor-I, HMR 04-06-2014
Formation of Road at Tej Complex, Metro Secunderabad station Area along Church compound wall at SP road in stage-3 along Corridor-III-HMR (BT Road) 03-06-2014
Construction of Police barracks at Shahinayathgunj, PS Complex (rear side) in lieu of Police Stations / Properties / Quarters affected under road widening in three Metro corridors. Estimate Cost: 864 Lakh - Tender invited - Reg 31-05-2014
(1) Providing Electrification to West block in 2nd floor of Swarna jayanthi complex
(2) Providing Electrification to North block in 2nd floor of Swarna jayanthi complex
(3) Providing Electrification to South block in 2nd floor of Swarna jayanthi complex
19-05-2014
Providing B.T renewal coat for the approach road to the integrated School complex at Kukatpally, Corridor - I, HMR 17-05-2014
Designing and construction of office accommodation for the Commissioner WD&CW Dept, Regional Joint Director, WTTI and Hostel building for the Durgabai Deshmukh Women's college in the premises of Taruni Complex, Madhuranagar - under Engineering Procurement and Construction (EPC) system. 29-04-2014
Providing BT Road by Hot Mix Process in the widened portion at certain areas of Corridor II and construction of compound wall to P&C land at Hydernagar, Corridor I and Dismantling works at certain areas of Corridor III-HMR 17-04-2014
Dismantling of property Bearing No: 8-2-293/82/1/227 (Nandini Cafe) Jubilee Hills Check Post, Corridor-III, HMR 11-04-2014
Construction of compound wall to the integrated School Building (Eastern Side) and Providing pavement with interlocking concrete block in the Integrated School complex area at Kukatpally-Corridor-I, HMR 11-04-2014
Results of Design Competition on Planning and Designing of Landscaping in central media along the Hyderabad Metro Rail Corridors 29-03-2014
M.S. Shed fabricated welded with 12mm plate and using 153mm round pipe for pillar welded with plate of 16mm in bottom and 12mm plate in top side for truss using 50mm size sq pipe MS plate of 12mm in bottom on the truss on both sides. purlin with 50mm sq pipe, corrugated colour sheet etc complete as and where it is condition. 03-03-2014
Providing 150mm thick C.C road in the Widened portion infront of H.No. 3-5-1148 (Trends Wear) to H.No. 3-5-1137/1 (Lee Shoe), H.No.3-5-1137(Bachelor shop) to H.No.3-5-1130/1 to 4 (jeans World) Opp. Vysya Hostel near chilla to facilitate metro works in corridor-II. 28-02-2014
Dismantling Works along the three Metro Rail Corridors for fixing of Units rates 28-02-2014
Providing 150mm thick CC Road in the widened portion of certain areas on Musheerabad main road in Corridor-II & Re-construction of compound wall and gate to the premises of old Gandhi Hospital Mortuary area in Corridor-II & Providing 600mm dia RCC NP3 class storm water drain pipeline at certain areas of Musheerabad-Narayanaguda road to facilitate Metro works in Corridor-II & Widening the existing carriageway from Traffic PS chikkadpally to RK building (BT Road by HMP)- (2nd Call) 14-02-2014
Widening the road by reducing foot path providing kerb and foot path from St Ann's school to HMWS&SB office (CH 15+200 to 15+540) on Corridor-III, Secunderabad 14-02-2014
Re-construction of compound wall to the premises of Musheerabad APHDC &HMWS&SB of Corridor-II and Providing 150mm thick CC road at Kachiguda X roads in Corridor-II 11-02-2014
Construction of RR Masonry retaining walls at the entry/exit portion of the cellars for various properties of Corridor-II of HMR 06-02-2014
Dismantling of geen lodge Bearing No. 4-8-41 to 50, Hyderabad situated in the stretch from MGBS to Putlibowli Junction of Corridor - 1, i.e., Miyapur to L.B Nagar, Hyderabad. 27-01-2014
The Architects of short listed design entries for Design Competition of landscaping are requested to give a Power Point Presentation (PPT) to the evaluation committee of the Design Competition at Metro Rail Bhavan, Saifabad, Hyderabad. 15-02-2014
Providing alternative arrangements for class rooms and hostel arrangements for WTTI college in the premisses of Taruni Complex at Madhura Nagar- Corridor-III-HMR 06-01-2014
Tenders
Tenders
Start Date
Start Date
LOT 1&2 (Dismantled structural steel salvage of FOB Ameerpet & Khairatabad) 31-12-2013
Widening and strengthening of the existing carriageway in widened portion by laying BT along certain locations of Corridor-III and Corridor-II-HMR and Providing 150mm thick CC Road in the widened portion along certain locations of Corridor-II-HMR 24-12-2013
Dismantling of Private properties belongs to Sri B.Ganesh Rao & (5) others in respect fopre No.6-1-1061/A,B (Dwaraka Hotel G+4+pent house from 2nd exit gate to end property) situated in the stretch from Khairatabad to Lakadikapool in Corridor-1, HMR 23-12-2013
Dismantling of Private properties belongs to Sri B.Ganesh Rao & (5) others in respect fopre No.6-1-1061/A,B (Dwaraka Hotel G+4+pent house from 1st entrance gate to wine shop only) situated in the stretch from Khairatabad to Lakadikapool in Corridor-1, HMR 21-12-2013
HMR-Corridor-I Construction of Footpath like structure at P&C, jail Garden, Malakpet, Hyderabad. 21-12-2013
Miscellaneous trees of neem, peltophorum, subabul, Thespesia, Kanuga, neem, Cassia siamea, Raintree, Terminalia arjuna, sapindus, Neredu, etc., in certain locations of Corridor-II 07-12-2013
Providing side modern lighting on both sides from jubilee Bus station to Parade grounds flyover-Corridor-II 06-12-2013
Dismantling the affected portion of One (1) property bearing H.No.3-4-423/1 to 7 situated at Narayanguda 'x' roads in the stretch of corridor-II i.e., JBS- Falaknuma, Hyderabad. 06-12-2013
Providing BT surface at Madhapur, Corridor-III-HMR and Providing 150mm thick CC Road along Musherabad main road Narayanaguda Flyover-YMCA main road, Corridor-II-HMR 30-11-2013
Widening and strengthening of the existing carriageway in widened portion by laying BT Road along certain locations of Corridor-I 22-11-2013
List of Participants who have submitted their entries for the "Design Competition on Planning and Designing of landscaping in central median under the viaduct of Hyderabad Metro Rail corridors". 14-11-2013
Dismantling the affected portion of Two (2) property bearing H.no.3-5-1111/15 to 21(Fantoosh Showroom) & H.No.3-5-1130/1, 2, 3 & 4 (Jeans world) situated at Narayanaguda 'x' roads to kachiguda 'x' roads in the stretch of corridor-II i.e., JBS-Falaknuma,Hyderabad. 29-10-2013
Miscellaneous trees of neem, peltophorum, subabul, Thespesia, kanuga, neem, Cassia siamea, Raintree, Terminalia arjuna, sapindus, Neredu, etc., (87 trees in the centre, 143 trees on the left side and 148 trees on the right side) along corridor-II of Hyderabad Metro Rail project will be sold in Public auction at Metro Rail Bhavan (Annex) 1st Floor on 12-11-2013 at 11.30 AM 28-10-2013
Activity schedule at the Metro Rail model exhibition daily between
5 pm to 8 pm
18-10-2013
Widening and strengthening of the existing carriageway in widened portion by laying BT Road by HMP along certain areas of corridor-I 17-10-2013
Construction of compound wall
to DCP office at S.P.Road, Secunderabad.
09-10-2013
1.Dismantling the affected portion of property bearing H.No.3-4-283 (towards YMCA) situated at Narayanguda 'x' roads to Kachiguda 'x' roads in the stretch of corridor-II i.e., JBS-Falaknuma, Hyderabad
2.Dismantling the affected portion of property bearing H.No.3-4-283 (towards Kachiguda Railway station) situated at Narayanguda 'x' roads to Kachiguda 'x' roads in the stretch of corridor-II i.e., JBS-Falaknuma, Hyderabad
08-10-2013
Presentation on Design Competition For landscape under the viaduct of Metro Rail Corridors 23-09-2013
Widening of existing BT Road and existing carriage way at different locations along corridor I & II 16-09-2013
378 miscellaneous trees of neem, peltophorum subabul, Thespesia, Kanuga, neem, Cassia siamea, Raintree, Terminalia arjuna, sapindus, Nered, etc., (87 trees in the center, 143 trees on the left side and 148 trees on the right side) existing from Clock tower to Old Gandhi Hospital and New Gandhi Hospital to Narayanguda 12-09-2013
1. LOT 1 (Dismantled structural steel salvage of FOB Rasoolpura / Secunderabad)
2. LOT 2 (dismantled structural steel salvage of FOB Prakash Nagar / HPS Secunderabad)
11-09-2013
Design Competition on Planning and Designing of Landscaping in central media under the viaduct of Hyderabad Metro Rail Corridors. 03-08-2013
1. LOT 1 (Dismantled structural steel salvage of FOB Rasoolpura / Secunderabad)
2. LOT 2 (dismantled structural steel salvage of FOB Prakash Nagar / HPS Secunderabad)
04-09-2013
Requirement of Chief Engineer & Deputy Chief Engineer 31-08-2013
Design Competition on Planning and Designing of Landscaping in central media under the viaduct of Hyderabad Metro Rail Corridors. 03-08-2013
378 miscellaneous trees of neem, peltophorum subabul, Thespesia, kanuga, neem, Cassiasiamea, Raintree, Terminalia arjuna, sapindus, Neredu, etc., (87 treesin the center, 143 tress on the left side and 148 trees on the right side) existing from Clock tower to Old Gandhi Hospital and New Gandhi Hospital to Narayanguda 20-08-2013
HMR-Corridor-II-Providing Plantation of trees along its catchment areas such as Devender nagar, Boduppal Kaman to Main Road and along road towards Peerzadiguda. 23-08-2013
Dismantling the affected portion of 1(one) property bearing H.No.1-5-560 situated at Musheerabad to Narayanguda in the strech of Corridor-II i.e., JBS to Falaknuma, Hyderabad. 23-08-2013
Plantation and Maintenance of 4 meter tall plants along Hyderabad - Gandipet road from Tipu khan during 2013-14 21-08-2013
Plantation and Maintenance of 4 meter tall avenue plants at various locations of Corridor III 20-08-2013
Widening the Existing Carriageway from Traffic P.S. Chikadpally to R.k. Building (BT Road by HMP) & Widening the Existing NH from Chaderghat to New Maket - Corridor - i (Stretch from MGBS to LB Nagar) (BT Road by HMP) 12-08-2013
Construction of 1800 mm dia RCC NP3 Class Strom Water drain on R/s of Corridor I from H.no.12-6-23/A/1 to 12-6-37/2 at Moosapet. Corridor I, HMR 16-08-2013
Design Competition on Planning and Designing of Landscaping in central media under the viaduct of Hyderabad Metro Rail Corridors. 03-08-2013
Construction of RDO/MRO Office Building at Secunderabad - Corridor - III 03-08-2013
HMR - Tree Plantation for the year 2013 - 2014 (Phase - II) 29-07-2013
Construction of RDO/MRO Office Building at Secunderabad-Corridor-III 27-07-2013
Construction of integrated school complex in existing premises of Govt. City Model School near MGBS, Chaderghat, Hyderabad, Corridor-1 27-07-2013
Providing security services at Metro Rail Bhavan and HMR P & C areas for the year 2013-14 20-07-2013
HMR - Plantation of trees 10-07-2013
widening of existing carriage way from Clock tower jn. to Passport office at Secunderabad Dt.02.07.2013 02-07-2013
Auction Notice - Dt.26.06.2013 26-06-2013
Request for Proposal for Appointment of Project Management Consultant - Dt.10.06.2013 10-06-2013
List of properties notified for acquisition in Metro Rail Corridors
Corridor-I (.PDF)
Corridor-II(.PDF)
Corridor-III (.PDF)